混合系统的贷方准备财务建模API API

API ID 13409

通过我们的贷款准备金融建模API获得信心,实现无缝的混合项目融资

API 文档

端点

请求
单站柴油转太阳能的初步可行性筛选:优化的光伏+BESS 规模、调度顺序、净现值/内部回报率/回报期、债务服务覆盖比合规标志、碳信用收益以及发电机热健康—无需完整的25年现金流计划。旨在快速进行初步资格审核。债务服务覆盖比/契约结果假设为无追索权、特殊目的公司的项目融资,并不是企业追索权贷款的可融资判决
Endpoint ID: 28872
POST https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28872/pre-feasibility+screening+report
输入参数

可行性初步筛选报告 — 端点功能

对象 描述
请求体 必需 Json

剩余免费测试请求:3 / 3。


输入参数

API 示例响应
JSON
{
    "status": "success",
    "api_version": "1.0.0",
    "financing_structure_scope": "This engine's DSCR / covenant bankability layer (see 'dscr' block below) assumes non-recourse, SPV-style project finance. It does not model corporate/balance-sheet-recourse financing structures, which are underwritten differently (consolidated financials, interest coverage) and are out of scope for this version.",
    "input": {
        "country": "Nigeria",
        "load_profile": "manufacturing",
        "avg_daily_load_kwh": 2400,
        "nameplate_kva": 500,
        "load_fraction": 0.75,
        "target_displacement_pct": 70,
        "backup_hours_target": 4
    },
    "country_context": {
        "irradiance_kwh_m2_yr": 1850,
        "grid_availability_pct": 45,
        "diesel_price_usd_l": 0.55,
        "grid_tariff_usd_kwh": 0.035,
        "currency": "NGN",
        "ambient_temp_c": 32,
        "source_irradiance": "NASA POWER MERRA-2; Fraunhofer ISE PV Report 2024",
        "source_diesel": "GIZ HERA (2019); NNPC pump price 2024"
    },
    "diesel_baseline": {
        "fuel_cost_usd_kwh": 0.1969,
        "maintenance_usd_kwh": 0.015,
        "replacement_amort_usd_kwh": 0.0292,
        "total_all_in_usd_kwh": 0.2411,
        "fuel_consumption_lph": 107.4,
        "load_kw": 300,
        "source_fuel_curve": "ISO 8528-1:2005 §13",
        "source_maintenance": "GIZ HERA (2019); Wood Mackenzie Africa C&I (2022)"
    },
    "generator_health": {
        "load_fraction": 0.75,
        "load_kw": 300,
        "wet_stack_risk": false,
        "warning": null,
        "source": "Cummins Power Generation Application Note (2002); GIZ HERA (2019) §4.3"
    },
    "grid_downtime_cost": {
        "grid_availability_pct": 45,
        "grid_down_hours_yr": 4818,
        "backup_energy_needed_kwh": 481800,
        "diesel_backup_cost_usd_yr": 116162,
        "productive_loss_usd_yr": null,
        "productive_loss_plausibility_flag": null,
        "total_downtime_cost_usd_yr": 116162,
        "source": "World Bank Enterprise Surveys (2023); ESMAP (2023); GIZ HERA (2019)"
    },
    "solar_sizing": {
        "pv_capacity_kw_dc": 689.5,
        "inverter_ac_capacity_kw": 574.6,
        "dc_ac_ratio": 1.2,
        "annual_pv_output_kwh_ac": 830375,
        "direct_solar_consumed_kwh": 597870,
        "solar_fraction_pct_sizing": 68.2,
        "note_solar_fraction": "This is the pre-BESS sizing estimate. dispatch_model.diesel_displacement_pct is the authoritative post-dispatch figure.",
        "curtailed_kwh_upper": 232505,
        "specific_yield_kwh_kwp": 1235,
        "thermal_derating_factor": 0.856,
        "system_pr": 0.78,
        "capex_usd_per_wp": 0.78,
        "pv_capex_usd": 537804,
        "source_sizing": "Neubauer & Simpson (2015) NREL/TP-5400-63162 §3.2",
        "source_yield": "PVGIS-SARAH2; Fraunhofer ISE PV Report 2024 (Africa PR=0.78)",
        "source_thermal": "King et al. (2004) NREL; IEC 61215:2021 §11.5",
        "source_capex": "NREL ATB 2024 Commercial PV + Africa logistics premium (Wood Mackenzie 2024)"
    },
    "land_area": {
        "ground_mount_m2": 5516,
        "rooftop_m2": 4137,
        "ground_mount_ha": 0.55,
        "note": "Ground-mount includes inter-row spacing for 0°–30° latitude sites.",
        "source": "NREL Land-Use Requirements for Solar Power Plants (2013); Fraunhofer ISE 2024"
    },
    "bess_sizing": {
        "bess_usable_energy_kwh": 400,
        "bess_nameplate_energy_kwh": 522.9,
        "bess_power_kw": 261.4,
        "backup_hours_achieved": 4,
        "round_trip_efficiency_pct": 85,
        "depth_of_discharge_pct": 90,
        "daily_cycle_rate": 0.8,
        "pack_cost_usd": 94118,
        "bos_cost_usd": 31373,
        "bess_capex_usd": 125490,
        "effective_life_years": 12,
        "cycle_limited": true,
        "soh_degradation_curve": {
            "year_1": 98.3,
            "year_3": 95,
            "year_5": 91.7,
            "year_7": 88.3,
            "year_11": 81.6,
            "end_of_life_trigger": "80% SOH — replacement recommended"
        },
        "lcos_usd_per_mwh": 120,
        "lcos_benchmark_range": "USD 160–250/MWh for LFP (PNNL-33283; BloombergNEF 2024)",
        "source_sizing": "Neubauer & Simpson (2015) NREL/TP-5400-63162",
        "source_capex": "NREL ATB 2024 two-component formula; BloombergNEF BESS Survey 2024",
        "source_lcos": "Mongird et al. (2022) PNNL-33283 §5.1",
        "source_rte": "NREL ATB 2024 Storage — LFP round-trip efficiency",
        "source_soh": "Mongird et al. (2022) PNNL-33283 §4.2; CATL LFP datasheet"
    },
    "dispatch_model": {
        "annual_load_kwh": 876000,
        "solar_direct_kwh": 569400,
        "bess_charge_kwh": 81760,
        "bess_to_load_kwh": 69496,
        "generator_kwh": 237104,
        "curtailed_kwh": 179215,
        "solar_fraction_pct": 72.9,
        "diesel_displaced_kwh": 638896,
        "diesel_displacement_pct": 72.9,
        "source": "Lambert et al. (2006) HOMER merit-order dispatch; IEEE Std 1562-2007"
    },
    "financials": {
        "total_capex_usd": 729623,
        "base_capex_usd": 663294,
        "contingency_capex_usd": 66329,
        "pv_capex_usd": 537804,
        "bess_capex_usd": 125490,
        "tax_benefit_yr1_usd": 0,
        "tax_benefit_note": "No Pioneer Status tax holiday applied — this is the conservative base case. Pioneer Status under the NIPC Act requires a formal application, approval, and a gazetted qualifying sector — it is not automatic. If this project has confirmed Pioneer Status approval, rerun with pioneer_status_confirmed=true to model the 3-yr CIT holiday upside. Source: NIPC Act Cap N117 LFN 2004; NIPC Pioneer Status Instrument 2023.",
        "tax_benefit_treatment": "Tax holiday / accelerated depreciation benefit is realised as a one-time Year-1 operating cashflow addback (see cashflows_all_25yr[0]), not as a reduction of project capex. Debt and equity are sized against gross total_capex_usd. This matches conventional DFI/IFC project-finance treatment: construction is financed at full cost before any tax benefit is realised; the tax shield improves debt service coverage in the year it is claimed rather than reducing the amount financed.",
        "net_capex_after_tax_usd": 729623,
        "net_capex_after_tax_usd_note": "Memo figure only — shown for reference, not used in NPV, IRR, payback, or debt sizing. See tax_benefit_treatment above.",
        "annual_diesel_savings_usd": 154038,
        "annual_om_usd": 10577,
        "annual_insurance_usd": 3316,
        "npv_usd": 814913,
        "irr_pct": 21.3,
        "simple_payback_years": 5,
        "lcoe_solar_bess_usd_kwh": 0.0586,
        "diesel_allin_cost_usd_kwh": 0.2411,
        "lcoe_vs_diesel_usd_kwh": 0.1825,
        "co2_saved_tonnes_yr": 613,
        "co2_saved_tonnes_25yr": 15325,
        "diesel_saved_litres_yr": 228725,
        "discount_rate_pct": 10,
        "diesel_escalation_pct_yr": 3,
        "project_life_yr": 25,
        "source_irena": "IRENA (2023) Renewable Power Generation Costs §4",
        "source_tax": "NIPC Act Cap N117 LFN 2004; NIPC Pioneer Status Instrument 2023",
        "source_co2": "IPCC 2006 Guidelines Vol 2 Ch1 Table 1.4; EPA GHG emission factors",
        "source_ifc": "IFC (2023) Mobilizing Private Investment in Clean Energy Africa"
    },
    "dscr": {
        "financing_structure": "non_recourse_project_finance_spv",
        "scope_note": "DSCR and covenant results assume non-recourse, SPV-style project finance. Not applicable as-is to corporate/balance-sheet-recourse financing, which is underwritten on consolidated financials and interest coverage, not isolated project CFADS.",
        "debt_fraction_pct": 70,
        "debt_amount_usd": 510736,
        "equity_amount_usd": 218887,
        "loan_tenor_yr": 10,
        "interest_rate_pct": 12,
        "annual_debt_service_usd": 90392,
        "dscr_year_1": 1.54,
        "dscr_minimum": 1.54,
        "dscr_minimum_year": 1,
        "lender_threshold": 1.3,
        "lender_bankability": "PASS",
        "note": "IFC minimum DSCR for green energy projects in Sub-Saharan Africa is 1.30. Projects below this require additional credit enhancement or concessional debt.",
        "source": "IFC (2023) Mobilizing Private Investment in Clean Energy Africa; World Bank ESMAP project finance guidelines (2022)",
        "covenant_table": [
            {
                "year": 1,
                "cfads_usd": 139130,
                "annual_debt_service": 90392,
                "dscr": 1.54,
                "below_ifc_minimum": false,
                "lockup_triggered": false,
                "default_triggered": false,
                "distribution_allowed": true,
                "covenant_status": "COMPLIANT"
            },
            {
                "year": 2,
                "cfads_usd": 142689,
                "annual_debt_service": 90392,
                "dscr": 1.58,
                "below_ifc_minimum": false,
                "lockup_triggered": false,
                "default_triggered": false,
                "distribution_allowed": true,
                "covenant_status": "COMPLIANT"
            },
            {
                "year": 3,
                "cfads_usd": 146338,
                "annual_debt_service": 90392,
                "dscr": 1.62,
                "below_ifc_minimum": false,
                "lockup_triggered": false,
                "default_triggered": false
            }
        ]
    },
    "_note": "Response truncated for documentation purposes"
}
可行性初步筛选报告 — 代码片段

curl --location --request POST 'https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28872/pre-feasibility+screening+report' --header 'Authorization: Bearer YOUR_API_KEY' 

--data-raw '{
  "avg_daily_load_kwh": 2400,
  "backup_hours_target": 4,
  "country": "nigeria",
  "load_fraction": 0.75,
  "load_profile": "manufacturing",
  "nameplate_kva": 500,
  "target_diesel_displacement_pct": 70
}'

    
请求
机构承销模型包含完整的25年年度现金流时间表,非线性BESS健康状态衰减,可配置的债务结构(期限、利率、财务杠杆),DSCR契约表和碳注册会计——这是贷方信用委员会所期望的完整工程与金融套餐。范围:建模无追索权、SPV风格的项目融资(债务规模和契约针对孤立项目CFADS)——不是企业/资产负债表追索的贷款方法。南非§12B税收处理是根据法规限额的,而不是统一税率。 carbon_standard并非从任何端点检索——这是一个可选字段,仅接受两个固定值:“vcs”(Verra VCS VM0038,省略时为默认值)或“gold_standard”(Gold Standard AMS-I.D.,其价格溢价高于VCS)。选择您打算在其下认证信用的注册;无需查找。
Endpoint ID: 28873
POST https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28873/lender-grade+full+underwriting+model
输入参数

贷款机构等级全额承保模型 — 端点功能

对象 描述
请求体 必需 Json

剩余免费测试请求:3 / 3。


输入参数

API 示例响应
JSON
{
    "status": "success",
    "api_version": "1.0.0",
    "financing_structure_scope": "This engine's DSCR / covenant bankability layer (see 'dscr' block below) assumes non-recourse, SPV-style project finance. It does not model corporate/balance-sheet-recourse financing structures, which are underwritten differently (consolidated financials, interest coverage) and are out of scope for this version.",
    "input": {
        "country": "South Africa",
        "load_profile": "manufacturing",
        "avg_daily_load_kwh": 4800,
        "nameplate_kva": 1000,
        "load_fraction": 0.75,
        "target_displacement_pct": 75,
        "backup_hours_target": 6
    },
    "country_context": {
        "irradiance_kwh_m2_yr": 1950,
        "grid_availability_pct": 65,
        "diesel_price_usd_l": 1.1,
        "grid_tariff_usd_kwh": 0.135,
        "currency": "ZAR",
        "ambient_temp_c": 22,
        "source_irradiance": "PVGIS-SARAH2 (EU JRC); GeoSUN Africa atlas",
        "source_diesel": "SAPIA 2024"
    },
    "diesel_baseline": {
        "fuel_cost_usd_kwh": 0.3938,
        "maintenance_usd_kwh": 0.015,
        "replacement_amort_usd_kwh": 0.0292,
        "total_all_in_usd_kwh": 0.438,
        "fuel_consumption_lph": 214.8,
        "load_kw": 600,
        "source_fuel_curve": "ISO 8528-1:2005 §13",
        "source_maintenance": "GIZ HERA (2019); Wood Mackenzie Africa C&I (2022)"
    },
    "generator_health": {
        "load_fraction": 0.75,
        "load_kw": 600,
        "wet_stack_risk": false,
        "warning": null,
        "source": "Cummins Power Generation Application Note (2002); GIZ HERA (2019) §4.3"
    },
    "grid_downtime_cost": {
        "grid_availability_pct": 65,
        "grid_down_hours_yr": 3066,
        "backup_energy_needed_kwh": 613200,
        "diesel_backup_cost_usd_yr": 268582,
        "productive_loss_usd_yr": 3679200,
        "productive_loss_plausibility_flag": null,
        "total_downtime_cost_usd_yr": 3947782,
        "source": "World Bank Enterprise Surveys (2023); ESMAP (2023); GIZ HERA (2019)"
    },
    "solar_sizing": {
        "pv_capacity_kw_dc": 1331.7,
        "inverter_ac_capacity_kw": 1109.8,
        "dc_ac_ratio": 1.2,
        "annual_pv_output_kwh_ac": 1779375,
        "direct_solar_consumed_kwh": 1281150,
        "solar_fraction_pct_sizing": 73.1,
        "note_solar_fraction": "This is the pre-BESS sizing estimate. dispatch_model.diesel_displacement_pct is the authoritative post-dispatch figure.",
        "curtailed_kwh_upper": 498225,
        "specific_yield_kwh_kwp": 1370,
        "thermal_derating_factor": 0.901,
        "system_pr": 0.78,
        "capex_usd_per_wp": 0.78,
        "pv_capex_usd": 1038732,
        "source_sizing": "Neubauer & Simpson (2015) NREL/TP-5400-63162 §3.2",
        "source_yield": "PVGIS-SARAH2; Fraunhofer ISE PV Report 2024 (Africa PR=0.78)",
        "source_thermal": "King et al. (2004) NREL; IEC 61215:2021 §11.5",
        "source_capex": "NREL ATB 2024 Commercial PV + Africa logistics premium (Wood Mackenzie 2024)"
    },
    "land_area": {
        "ground_mount_m2": 10654,
        "rooftop_m2": 7990,
        "ground_mount_ha": 1.07,
        "note": "Ground-mount includes inter-row spacing for 0°–30° latitude sites.",
        "source": "NREL Land-Use Requirements for Solar Power Plants (2013); Fraunhofer ISE 2024"
    },
    "bess_sizing": {
        "bess_usable_energy_kwh": 1200,
        "bess_nameplate_energy_kwh": 1568.6,
        "bess_power_kw": 784.3,
        "backup_hours_achieved": 6,
        "round_trip_efficiency_pct": 85,
        "depth_of_discharge_pct": 90,
        "daily_cycle_rate": 0.8,
        "pack_cost_usd": 282353,
        "bos_cost_usd": 94118,
        "bess_capex_usd": 376471,
        "effective_life_years": 12,
        "cycle_limited": true,
        "soh_degradation_curve": {
            "year_1": 98.3,
            "year_3": 95,
            "year_5": 91.7,
            "year_7": 88.3,
            "year_11": 81.6,
            "end_of_life_trigger": "80% SOH — replacement recommended"
        },
        "lcos_usd_per_mwh": 120,
        "lcos_benchmark_range": "USD 160–250/MWh for LFP (PNNL-33283; BloombergNEF 2024)",
        "source_sizing": "Neubauer & Simpson (2015) NREL/TP-5400-63162",
        "source_capex": "NREL ATB 2024 two-component formula; BloombergNEF BESS Survey 2024",
        "source_lcos": "Mongird et al. (2022) PNNL-33283 §5.1",
        "source_rte": "NREL ATB 2024 Storage — LFP round-trip efficiency",
        "source_soh": "Mongird et al. (2022) PNNL-33283 §4.2; CATL LFP datasheet"
    },
    "dispatch_model": {
        "annual_load_kwh": 1752000,
        "solar_direct_kwh": 1138800,
        "bess_charge_kwh": 245280,
        "bess_to_load_kwh": 208488,
        "generator_kwh": 404712,
        "curtailed_kwh": 395295,
        "solar_fraction_pct": 76.9,
        "diesel_displaced_kwh": 1347288,
        "diesel_displacement_pct": 76.9,
        "source": "Lambert et al. (2006) HOMER merit-order dispatch; IEEE Std 1562-2007"
    },
    "financials": {
        "total_capex_usd": 1556723,
        "base_capex_usd": 1415203,
        "contingency_capex_usd": 141520,
        "pv_capex_usd": 1038732,
        "bess_capex_usd": 376471,
        "tax_benefit_yr1_usd": 420315,
        "tax_benefit_note": "SA Income Tax Act §12B(1)(h) — solar PV not exceeding 1 MW. Nameplate 1000 kVA used as a proxy for generation capacity in kW (assumes power factor ~1.0 — confirm true kW rating before underwriting if this figure is within a few percent of the 1000 kVA / 1 MW threshold). Self-assessed allowance — no discretionary government approval required to claim, unlike Nigeria Pioneer Status or a Free Zone election. Trade-use requirement is satisfied by construction: this engine only models commercial/industrial load profiles, never residential. Ownership/instalment-credit-agreement and first-use conditions should still be confirmed with in-country counsel before underwriting — this figure assumes both are met. Reported value is the Year-1-present-value-equivalent of the 100% statutory schedule, not a flat rate.",
        "tax_benefit_treatment": "Tax holiday / accelerated depreciation benefit is realised as a one-time Year-1 operating cashflow addback (see cashflows_all_25yr[0]), not as a reduction of project capex. Debt and equity are sized against gross total_capex_usd. This matches conventional DFI/IFC project-finance treatment: construction is financed at full cost before any tax benefit is realised; the tax shield improves debt service coverage in the year it is claimed rather than reducing the amount financed.",
        "net_capex_after_tax_usd": 1136408,
        "net_capex_after_tax_usd_note": "Memo figure only — shown for reference, not used in NPV, IRR, payback, or debt sizing. See tax_benefit_treatment above.",
        "annual_diesel_savings_usd": 590112,
        "annual_om_usd": 23110,
        "annual_insurance_usd": 7076,
        "npv_usd": 4986480,
        "irr_pct": 46.3,
        "simple_payback_years": 3,
        "lcoe_solar_bess_usd_kwh": 0.0594,
        "diesel_allin_cost_usd_kwh": 0.438,
        "lcoe_vs_diesel_usd_kwh": 0.3786,
        "co2_saved_tonnes_yr": 1292.6,
        "co2_saved_tonnes_25yr": 32316,
        "diesel_saved_litres_yr": 482329,
        "cashflows_yr1_to_10": [
            976757,
            570490,
            584891,
            599652,
            614785,
            630296,
            646197,
            662496,
            679204,
            696331
        ],
        "cashflows_all_25yr": [
            976757,
            570490,
            584891,
            599652,
            614785,
            630296,
            646197,
            662496,
            679204,
            696331,
            713888,
            731885,
            750333,
            769243,
            788627,
            808497,
            828866,
            849744,
            871146,
            893085,
            915572,
            938624,
            962253,
            986474,
            1011301
        ],
        "discount_rate_pct": 10,
        "diesel_escalation_pct_yr": 3,
        "project_life_yr": 25,
        "source_irena": "IRENA (2023) Renewable Power Generation Costs §4",
        "source_tax": "SA Income Tax Act §12B (Act 58 of 1962, amended 2023)",
        "source_co2": "IPCC 2006 Guidelines Vol 2 Ch1 Table 1.4; EPA GHG emission factors",
        "source_ifc": "IFC (2023) Mobilizing Private Investment in Clean Energy Africa"
    },
    "dscr": {
        "financing_structure": "non_recourse_project_finance_spv",
        "scope_note": "DSCR and covenant results assume non-recourse, SPV-style project finance. Not applicable as-is to corporate/balance-sheet-recourse financing, which is underwritten on consolidated financials and interest coverage, not isolated project CFADS.",
        "debt_fraction_pct": 70,
        "debt_amount_usd": 1089706,
        "equity_amount_usd": 467017,
        "loan_tenor_yr": 10,
        "interest_rate_pct": 12,
        "annual_debt_service_usd": 192861,
        "dscr_year_1": 5.06,
        "dscr_minimum": 2.96,
        "dscr_minimum_year": 2,
        "lender_threshold": 1.3,
        "lender_bankability": "PASS",
        "note": "IFC minimum DSCR for green energy projects in Sub-Saharan Africa is 1.30. Projects below this require additional credit enhancement or concessional debt."
    },
    "_note": "Response truncated for documentation purposes"
}
贷款机构等级全额承保模型 — 代码片段

curl --location --request POST 'https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28873/lender-grade+full+underwriting+model' --header 'Authorization: Bearer YOUR_API_KEY' 

--data-raw '{
  "country": "south_africa",
  "load_profile": "manufacturing",
  "avg_daily_load_kwh": 4800,
  "nameplate_kva": 1000,
  "load_fraction": 0.75,
  "target_diesel_displacement_pct": 75,
  "backup_hours_target": 6,
  "project_life_yr": 25,
  "discount_rate_pct": 10,
  "revenue_per_operating_hour_usd": 1200,
  "debt_fraction_pct": 70,
  "loan_tenor_yr": 10,
  "interest_rate_pct": 12.0,
  "carbon_standard": "vcs"
}'

    
请求
一次最多运行30个站点并按内部收益率排名返回每个站点,同时提供集中化的投资组合指标——总资本支出、混合碳收入、DSCR通过/不通过计数和验证错误——以便开发人员或基金同时筛选多站点管道。每个站点的DSCR通过/不通过假设采用非追索权、特定目的公司(SPV)风格的项目融资,而不是合并的公司追索权债务 site_id并不是从任何端点检索的——它是您为请求中每个站点自行选择的标签(例如“factory_ZA_001”、“tower_NG_014”)。它仅用于将该站点的结果与您发送的站点相匹配;没有经过任何列表或登记的验证,因此任何非空字符串都可以使用
Endpoint ID: 28874
POST https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28874/portfolio+screening+and+fleet+ranking+report
输入参数

投资组合筛选与车队排名报告 — 端点功能

对象 描述
请求体 必需 Json
请求体 必需 Json

剩余免费测试请求:3 / 3。


输入参数

API 示例响应
JSON
{
    "status": "success",
    "api_version": "1.0.0",
    "sites_analysed": 3,
    "portfolio_summary": {
        "total_capex_usd": 3119874,
        "total_annual_savings_usd": 1294720,
        "total_co2_saved_tonnes_yr": 2896.9,
        "total_carbon_net_revenue_yr_usd": 31286,
        "avg_annual_savings_per_site_usd": 431573,
        "dscr_lender_pass_count": 2,
        "dscr_lender_fail_count": 1,
        "sites_errored_count": 0,
        "sites_successfully_analysed": 3,
        "sites_by_viability": {
            "marginal": 1,
            "excellent": 2
        }
    },
    "sites": [
        {
            "site_id": "factory_ZA_001",
            "country": "South Africa",
            "load_profile": "manufacturing",
            "pv_capacity_kw": 2130.7,
            "bess_energy_kwh": 1600,
            "diesel_displacement_pct": 72.9,
            "total_capex_usd": 2380325,
            "npv_usd": 10281945,
            "irr_pct": 57.3,
            "payback_years": 2,
            "dscr_lender_pass": true,
            "annual_savings_usd": 1147202,
            "co2_saved_tonnes_yr": 2506.7,
            "carbon_net_revenue_yr_usd": 27072,
            "lcoe_usd_kwh": 0.0478,
            "diesel_allin_usd_kwh": 0.4489,
            "fx_risk_level": "MEDIUM",
            "viability": "excellent"
        },
        {
            "site_id": "cold_KE_001",
            "country": "Kenya",
            "load_profile": "cold_chain",
            "pv_capacity_kw": 359.7,
            "bess_energy_kwh": 300,
            "diesel_displacement_pct": 66.4,
            "total_capex_usd": 459662,
            "npv_usd": 732648,
            "irr_pct": 25.8,
            "payback_years": 5,
            "dscr_lender_pass": true,
            "annual_savings_usd": 117081,
            "co2_saved_tonnes_yr": 268.6,
            "carbon_net_revenue_yr_usd": 2901,
            "lcoe_usd_kwh": 0.0812,
            "diesel_allin_usd_kwh": 0.4028,
            "fx_risk_level": "MEDIUM",
            "viability": "excellent"
        },
        {
            "site_id": "tower_NG_001",
            "country": "Nigeria",
            "load_profile": "telecoms_tower",
            "pv_capacity_kw": 226.9,
            "bess_energy_kwh": 160,
            "diesel_displacement_pct": 73.8,
            "total_capex_usd": 279887,
            "npv_usd": -2199,
            "irr_pct": null,
            "payback_years": 10,
            "dscr_lender_pass": false,
            "annual_savings_usd": 30437,
            "co2_saved_tonnes_yr": 121.6,
            "carbon_net_revenue_yr_usd": 1313,
            "lcoe_usd_kwh": 0.111,
            "diesel_allin_usd_kwh": 0.2354,
            "fx_risk_level": "HIGH",
            "viability": "marginal"
        }
    ],
    "source": "ISO 8528-1:2005 | NREL ATB 2024 | NREL/TP-5400-63162 | IRENA 2023 | PNNL-33283 | Jordan & Kurtz (2013) | IFC (2023) project finance | Verra VCS VM0038",
    "access": "entitled"
}
投资组合筛选与车队排名报告 — 代码片段

curl --location --request POST 'https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28874/portfolio+screening+and+fleet+ranking+report' --header 'Authorization: Bearer YOUR_API_KEY' 

--data-raw '{
  "sites": [
    {
      "site_id": "tower_NG_001",
      "country": "nigeria",
      "load_profile": "telecoms_tower",
      "avg_daily_load_kwh": 480,
      "nameplate_kva": 100,
      "load_fraction": 0.80,
      "target_diesel_displacement_pct": 80,
      "backup_hours_target": 8
    },
    {
      "site_id": "factory_ZA_001",
      "country": "south_africa",
      "load_profile": "manufacturing",
      "avg_daily_load_kwh": 9600,
      "nameplate_kva": 2000,
      "load_fraction": 0.70,
      "target_diesel_displacement_pct": 60,
      "backup_hours_target": 4
    },
    {
      "site_id": "cold_KE_001",
      "country": "kenya",
      "load_profile": "cold_chain",
      "avg_daily_load_kwh": 1200,
      "nameplate_kva": 250,
      "load_fraction": 0.85,
      "target_diesel_displacement_pct": 55,
      "backup_hours_target": 6
    }
  ],
  "project_life_yr": 25,
  "discount_rate_pct": 10
}'

    
请求
结构化的8部分数据包——执行摘要、国家经济背景、工程设计、财务账本、债务结构、风险登记、环境、社会和治理指标以及来源引文——预格式化为无头PDF生成(ReportLab、WeasyPrint、Puppeteer)成客户准备的可行性报告。债务结构和契约部分假定为无追索权的SPV风格项目融资,而非企业追索贷款。各国的税收激励处理是特定于法规的并且有资格限制,在第二部分按国家披露。 carbon_standard并不是从任何端点获取——它是一个可选字段,只接受确切的两个固定值:“vcs”(Verra VCS VM0038,若省略则为默认值)或“gold_standard”(Gold Standard AMS-I.D.,其价格高于VCS)。选择你打算在哪个登记处认证信用;无需查找。
Endpoint ID: 28875
POST https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28875/bankable+lender+package+8-section+report+data
输入参数

可融资贷款人套餐8个部分报告数据 — 端点功能

对象 描述
请求体 必需 Json
请求体 必需 Json

剩余免费测试请求:3 / 3。


输入参数

API 示例响应
JSON
{
    "status": "success",
    "api_version": "1.0.0",
    "report_type": "bankable_pre_feasibility",
    "generated_at": "2026-08-03T19:02:25Z",
    "access": "entitled",
    "section_1_executive_summary": {
        "viability_rating": "EXCELLENT",
        "headline": "Excellent: 77% diesel displacement, 3-yr payback, 46.3% IRR. LCOE $0.059/kWh vs diesel $0.438/kWh. Lender DSCR: PASS.",
        "pv_capacity_kw": 1331.7,
        "bess_energy_kwh": 1200,
        "diesel_displacement_pct": 76.9,
        "total_capex_usd": 1556723,
        "npv_usd": 4986480,
        "irr_pct": 46.3,
        "payback_years": 3,
        "lcoe_solar_bess_usd_kwh": 0.0594,
        "diesel_allin_usd_kwh": 0.438,
        "lcoe_saving_per_kwh": 0.3786,
        "annual_savings_usd": 590112,
        "co2_saved_tonnes_yr": 1292.6,
        "lender_bankability": "PASS",
        "fx_risk_level": "MEDIUM"
    },
    "section_2_country_context": {
        "irradiance_kwh_m2_yr": 1950,
        "grid_availability_pct": 65,
        "diesel_price_usd_l": 1.1,
        "grid_tariff_usd_kwh": 0.135,
        "currency": "ZAR",
        "ambient_temp_c": 22,
        "source_irradiance": "PVGIS-SARAH2 (EU JRC); GeoSUN Africa atlas",
        "source_diesel": "SAPIA 2024",
        "incentives": {
            "section_12b": true,
            "corporate_tax_rate": 0.27,
            "vat_rate": 0.15,
            "carbon_credit_eligible": true
        },
        "incentive_source": "SA Income Tax Act §12B (Act 58 of 1962, amended 2023)",
        "downtime_analysis": {
            "grid_availability_pct": 65,
            "grid_down_hours_yr": 3066,
            "backup_energy_needed_kwh": 613200,
            "diesel_backup_cost_usd_yr": 268582,
            "productive_loss_usd_yr": null,
            "productive_loss_plausibility_flag": null,
            "total_downtime_cost_usd_yr": 268582,
            "source": "World Bank Enterprise Surveys (2023); ESMAP (2023); GIZ HERA (2019)"
        }
    },
    "section_3_technical_design": {
        "solar_sizing": {
            "pv_capacity_kw_dc": 1331.7,
            "inverter_ac_capacity_kw": 1109.8,
            "dc_ac_ratio": 1.2,
            "annual_pv_output_kwh_ac": 1779375,
            "direct_solar_consumed_kwh": 1281150,
            "solar_fraction_pct_sizing": 73.1,
            "note_solar_fraction": "This is the pre-BESS sizing estimate. dispatch_model.diesel_displacement_pct is the authoritative post-dispatch figure.",
            "curtailed_kwh_upper": 498225,
            "specific_yield_kwh_kwp": 1370,
            "thermal_derating_factor": 0.901,
            "system_pr": 0.78,
            "capex_usd_per_wp": 0.78,
            "pv_capex_usd": 1038732,
            "source_sizing": "Neubauer & Simpson (2015) NREL/TP-5400-63162 §3.2",
            "source_yield": "PVGIS-SARAH2; Fraunhofer ISE PV Report 2024 (Africa PR=0.78)",
            "source_thermal": "King et al. (2004) NREL; IEC 61215:2021 §11.5",
            "source_capex": "NREL ATB 2024 Commercial PV + Africa logistics premium (Wood Mackenzie 2024)"
        },
        "bess_sizing": {
            "bess_usable_energy_kwh": 1200,
            "bess_nameplate_energy_kwh": 1568.6,
            "bess_power_kw": 784.3,
            "backup_hours_achieved": 6,
            "round_trip_efficiency_pct": 85,
            "depth_of_discharge_pct": 90,
            "daily_cycle_rate": 0.8,
            "pack_cost_usd": 282353,
            "bos_cost_usd": 94118,
            "bess_capex_usd": 376471,
            "effective_life_years": 12,
            "cycle_limited": true,
            "soh_degradation_curve": {
                "year_1": 98.3,
                "year_3": 95,
                "year_5": 91.7,
                "year_7": 88.3,
                "year_11": 81.6,
                "end_of_life_trigger": "80% SOH — replacement recommended"
            },
            "lcos_usd_per_mwh": 120,
            "lcos_benchmark_range": "USD 160–250/MWh for LFP (PNNL-33283; BloombergNEF 2024)",
            "source_sizing": "Neubauer & Simpson (2015) NREL/TP-5400-63162",
            "source_capex": "NREL ATB 2024 two-component formula; BloombergNEF BESS Survey 2024",
            "source_lcos": "Mongird et al. (2022) PNNL-33283 §5.1",
            "source_rte": "NREL ATB 2024 Storage — LFP round-trip efficiency",
            "source_soh": "Mongird et al. (2022) PNNL-33283 §4.2; CATL LFP datasheet"
        },
        "dispatch_model": {
            "annual_load_kwh": 1752000,
            "solar_direct_kwh": 1138800,
            "bess_charge_kwh": 245280,
            "bess_to_load_kwh": 208488,
            "generator_kwh": 404712,
            "curtailed_kwh": 395295,
            "solar_fraction_pct": 76.9,
            "diesel_displaced_kwh": 1347288,
            "diesel_displacement_pct": 76.9,
            "source": "Lambert et al. (2006) HOMER merit-order dispatch; IEEE Std 1562-2007"
        },
        "land_area": {
            "ground_mount_m2": 10654,
            "rooftop_m2": 7990,
            "ground_mount_ha": 1.07,
            "note": "Ground-mount includes inter-row spacing for 0°–30° latitude sites.",
            "source": "NREL Land-Use Requirements for Solar Power Plants (2013); Fraunhofer ISE 2024"
        },
        "generator_health": {
            "load_fraction": 0.75,
            "load_kw": 600,
            "wet_stack_risk": false,
            "warning": null,
            "source": "Cummins Power Generation Application Note (2002); GIZ HERA (2019) §4.3"
        },
        "thermal_derating": {
            "ambient_temp_c": 22,
            "derating_factor_applied": 0.901,
            "note": "Cell temp = ambient + 25°C (NOCT); Pmax coeff = -0.45%/°C"
        },
        "inverter_sizing": {
            "dc_ac_ratio": 1.2,
            "inverter_ac_kw": 1109.8,
            "pv_dc_kw": 1331.7,
            "note": "DC:AC 1.20 — NREL standard for utility-adjacent C&I"
        },
        "design_note": "All sizing is pre-feasibility. Commission a licensed electrical engineer (IEC 62548 / NEC 690) before procurement."
    },
    "section_4_financial_model": {
        "capex_breakdown": {
            "pv_capex_usd": 1038732,
            "bess_capex_usd": 376471,
            "contingency_10pct_usd": 141520,
            "total_capex_usd": 1556723
        },
        "tax_incentives": {
            "tax_benefit_yr1_usd": 420315,
            "net_capex_after_tax_usd": 1136408,
            "tax_note": "SA Income Tax Act §12B(1)(h) — solar PV not exceeding 1 MW. Nameplate 1000 kVA used as a proxy for generation capacity in kW (assumes power factor ~1.0 — confirm true kW rating before underwriting if this figure is within a few percent of the 1000 kVA / 1 MW threshold). Self-assessed allowance — no discretionary government approval required to claim, unlike Nigeria Pioneer Status or a Free Zone election. Trade-use requirement is satisfied by construction: this engine only models commercial/industrial load profiles, never residential. Ownership/instalment-credit-agreement and first-use conditions should still be confirmed with in-country counsel before underwriting — this figure assumes both are met. Reported value is the Year-1-present-value-equivalent of the 100% statutory schedule, not a flat rate."
        },
        "annual_economics": {
            "diesel_savings_yr1_usd": 590112,
            "om_yr1_usd": 23110,
            "insurance_yr1_usd": 7076,
            "net_cashflow_yr1_usd": 976757,
            "net_cashflow_yr1_note": "Includes the one-time Year-1 tax benefit addback (see tax_incentives.tax_benefit_yr1_usd above and financials.tax_benefit_treatment). This is why net_cashflow_yr1_usd is materially higher than diesel_savings_yr1_usd minus om/insurance alone."
        },
        "project_returns": {
            "npv_usd": 4986480,
            "irr_pct": 46.3,
            "simple_payback_years": 3,
            "lcoe_solar_bess": 0.0594,
            "diesel_allin": 0.438,
            "saving_per_kwh": 0.3786
        },
        "cashflow_schedule_25yr": [
            976757,
            570490,
            584891,
            599652,
            614785,
            630296,
            646197,
            662496,
            679204,
            696331,
            713888,
            731885,
            750333,
            769243,
            788627,
            808497,
            828866,
            849744,
            871146,
            893085,
            915572,
            938624,
            962253,
            986474,
            1011301
        ],
        "assumptions": {
            "discount_rate_pct": 10,
            "diesel_escalation_pct_yr": 3,
            "pv_degradation_pct_yr": 0.5,
            "project_life_yr": 25,
            "om_escalation_pct_yr": 2
        }
    },
    "section_5_debt_structuring": {
        "financing_structure": "non_recourse_project_finance_spv",
        "scope_note": "DSCR and covenant results assume non-recourse, SPV-style project finance. Not applicable as-is to corporate/balance-sheet-recourse financing, which is underwritten on consolidated financials and interest coverage, not isolated project CFADS.",
        "debt_fraction_pct": 70,
        "debt_amount_usd": 1089706,
        "equity_amount_usd": 467017,
        "loan_tenor_yr": 10,
        "interest_rate_pct": 12,
        "annual_debt_service_usd": 192861,
        "dscr_year_1": 5.06,
        "dscr_minimum": 2.96,
        "dscr_minimum_year": 2
    },
    "_note": "Response truncated for documentation purposes"
}
可融资贷款人套餐8个部分报告数据 — 代码片段

curl --location --request POST 'https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28875/bankable+lender+package+8-section+report+data' --header 'Authorization: Bearer YOUR_API_KEY' 

--data-raw '{
  "country": "south_africa",
  "load_profile": "manufacturing",
  "avg_daily_load_kwh": 4800,
  "nameplate_kva": 1000,
  "load_fraction": 0.75,
  "target_diesel_displacement_pct": 75,
  "backup_hours_target": 6,
  "debt_fraction_pct": 70,
  "loan_tenor_yr": 10,
  "interest_rate_pct": 12.0
}'

    
请求
零资本支出电力购买协议结构的双模式开发者与客户模型:开发者项目的内部收益率来自于电价现金流,客户第一年的节省,以及通过二分法在开发者的加权平均资本成本下求解的盈亏平衡电力购买协议电价——用于结构化能源即服务的报价,而不是直接的资产销售
Endpoint ID: 28876
POST https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28876/ppa+energy-as-a-service+deal+model
输入参数

PPA能源即服务交易模型 — 端点功能

对象 描述
请求体 必需 Json

剩余免费测试请求:3 / 3。


输入参数

API 示例响应
JSON
{
    "status": "success",
    "api_version": "1.0.0",
    "access": "entitled",
    "ppa_analysis": {
        "ppa_tariff_usd_kwh": 0.09,
        "ppa_escalation_pct_yr": 1.5,
        "developer_wacc_pct": 12,
        "developer_irr_pct": 4.62,
        "developer_capex_usd": 729623,
        "developer_tax_benefit_yr1_usd": 0,
        "developer_npv_at_wacc_usd": -354260,
        "ppa_revenue_yr1_usd": 57501,
        "total_ppa_revenue_25yr_usd": 1728646,
        "customer_saving_yr1_usd": 96537,
        "customer_saving_yr1_pct_vs_diesel": 62.7,
        "total_customer_savings_25yr_usd": 3887463,
        "break_even_tariff_usd_kwh": 0.1537,
        "zero_capex_for_customer": true,
        "recommendation": "PPA preferred if customer WACC > developer WACC or customer has balance-sheet constraints. CAPEX preferred if customer has access to cheap capital and wants long-term asset ownership and all savings.",
        "source": "IFC (2023) Mobilizing Private Investment in Clean Energy Africa §3.2. CrossBoundary Energy EaaS model — 20-country, $707M portfolio (2025). SEIA (2024) Power Purchase Agreement framework. Kamoa Copper DRC: 222 MWp + 526 MWh BESS, EaaS structure, April 2025."
    },
    "capex_summary": {
        "viability": "strong",
        "headline": "Strong: 73% displacement, 5-yr payback, 21.3% IRR. LCOE $0.059/kWh replaces diesel at $0.241/kWh.",
        "pv_capacity_kw": 689.5,
        "bess_energy_kwh": 400,
        "diesel_displacement_pct": 72.9,
        "total_capex_usd": 729623,
        "npv_usd": 814913,
        "irr_pct": 21.3,
        "payback_years": 5,
        "dscr_lender_pass": true,
        "dscr_bankability_score": "STRONG",
        "lcoe_solar_bess_usd_kwh": 0.0586,
        "diesel_allin_usd_kwh": 0.2411,
        "co2_saved_tonnes_yr": 613,
        "carbon_net_revenue_yr_usd": 6620,
        "annual_savings_usd": 154038,
        "fx_risk_level": "HIGH"
    },
    "country_context": {
        "irradiance_kwh_m2_yr": 1850,
        "grid_availability_pct": 45,
        "diesel_price_usd_l": 0.55,
        "grid_tariff_usd_kwh": 0.035,
        "currency": "NGN",
        "ambient_temp_c": 32,
        "source_irradiance": "NASA POWER MERRA-2; Fraunhofer ISE PV Report 2024",
        "source_diesel": "GIZ HERA (2019); NNPC pump price 2024"
    },
    "note": "PPA/EaaS is the dominant structure for C&I solar in Africa. CrossBoundary's Kamoa Copper DRC deal (222 MWp + 526 MWh, April 2025) and their $707M portfolio across 20 countries are all EaaS. See IFC (2023) §3.2 for PPA structuring guidance."
}
PPA能源即服务交易模型 — 代码片段

curl --location --request POST 'https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28876/ppa+energy-as-a-service+deal+model' --header 'Authorization: Bearer YOUR_API_KEY' 

--data-raw '{
  "country": "nigeria",
  "load_profile": "manufacturing",
  "avg_daily_load_kwh": 2400,
  "nameplate_kva": 500,
  "load_fraction": 0.75,
  "target_diesel_displacement_pct": 70,
  "backup_hours_target": 4,
  "ppa_tariff_usd_kwh": 0.09,
  "ppa_escalation_pct_yr": 1.5,
  "developer_wacc_pct": 12.0
}'

    
请求
平行保守(P90收益,柴油降低20%,资本支出增加15%)/ 基础 / 乐观情景运行,返回并排的内部收益率/净现值/债务服务覆盖比率和标准化的投资决策标签(投资/有条件进行/边际/不进行)——这是投资委员会在批准资本前审查的精确比较表。所有三个情景下的债务服务覆盖比率结果假设为无追索权的特殊目的公司项目融资
Endpoint ID: 28877
POST https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28877/investment+committee+stress-test+matrix
输入参数

投资委员会压力测试矩阵 — 端点功能

对象 描述
请求体 必需 Json

剩余免费测试请求:3 / 3。


输入参数

API 示例响应
JSON
{
    "scenarios": {
        "conservative": {
            "label": "Conservative (P90 irradiance, diesel −20%, CAPEX +15%)",
            "irr_pct": 13.8,
            "npv_usd": 316770,
            "payback_years": 8,
            "total_capex_usd": 914659,
            "lcoe_usd_kwh": 0.0734,
            "annual_savings_usd": 128865,
            "dscr_year_1": 0.98,
            "dscr_minimum": 0.98,
            "dscr_minimum_year": 1,
            "dscr_bankability": "FAIL — DSCR below 1.3",
            "viability": "marginal",
            "irradiance_used": 1665,
            "diesel_price_used": 0.44
        },
        "base": {
            "label": "Base Case (P50 irradiance, current diesel price)",
            "irr_pct": 21.3,
            "npv_usd": 814913,
            "payback_years": 5,
            "total_capex_usd": 729623,
            "lcoe_usd_kwh": 0.0586,
            "annual_savings_usd": 154038,
            "dscr_year_1": 1.54,
            "dscr_minimum": 1.54,
            "dscr_minimum_year": 1,
            "dscr_bankability": "PASS",
            "viability": "strong",
            "irradiance_used": 1850,
            "diesel_price_used": 0.55
        },
        "optimistic": {
            "label": "Optimistic (irradiance +5%, diesel +20%, CAPEX −5%)",
            "irr_pct": 27.2,
            "npv_usd": 1166436,
            "payback_years": 4,
            "total_capex_usd": 666380,
            "lcoe_usd_kwh": 0.0535,
            "annual_savings_usd": 179146,
            "dscr_year_1": 2,
            "dscr_minimum": 2,
            "dscr_minimum_year": 1,
            "dscr_bankability": "PASS",
            "viability": "excellent",
            "irradiance_used": 1942,
            "diesel_price_used": 0.66
        }
    },
    "investment_decision": "MARGINAL — consider concessional debt (6–8%) or DFI credit enhancement.",
    "source": "IRENA (2023) Renewable Power Generation Costs §4.6 risk framework. IFC (2023) Mobilizing Private Investment §5 stress-test protocol. Arcadis (2025) sensitivity analysis methodology — 5MW solar PV plant. IEA PVPS Task 13 (2024) P90 definition: P90 ≈ P50 × 0.90 for Africa.",
    "api_version": "1.0.0",
    "access": "entitled"
}
投资委员会压力测试矩阵 — 代码片段

curl --location --request POST 'https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28877/investment+committee+stress-test+matrix' --header 'Authorization: Bearer YOUR_API_KEY' 

--data-raw '{
  "country": "nigeria",
  "load_profile": "manufacturing",
  "avg_daily_load_kwh": 2400,
  "nameplate_kva": 500,
  "load_fraction": 0.75,
  "target_diesel_displacement_pct": 70,
  "backup_hours_target": 4,
  "discount_rate_pct": 10,
  "debt_fraction_pct": 70,
  "loan_tenor_yr": 10,
  "interest_rate_pct": 12.0
}'

    
请求
在一次调用中对一个国家运行所有8个行业负载配置文件,并按财务表现对它们进行排名,通过内部收益率和项目融资偿还率(无追索权,SPV风格项目融资)标记出最佳推荐——以确定在新市场中最先瞄准哪个行业垂直领域
Endpoint ID: 28878
POST https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28878/sector+market+map+-+country+screen
输入参数

行业市场地图 - 国家筛选 — 端点功能

对象 描述
请求体 必需 Json

剩余免费测试请求:3 / 3。


输入参数

API 示例响应
JSON
{
    "status": "success",
    "api_version": "1.0.0",
    "country": "Nigeria",
    "diesel_price_usd_l": 0.55,
    "grid_availability_pct": 45,
    "top_sector": "commercial_office",
    "top_sector_caveat": null,
    "irr_leader_sector": "commercial_office",
    "sectors_ranked_by_irr": [
        {
            "load_profile": "commercial_office",
            "description": "Office buildings — HVAC, lighting, computers",
            "solar_coincidence_pct": 80,
            "diesel_displacement_pct": 78,
            "pv_capacity_kw": 620.5,
            "bess_energy_kwh": 400,
            "total_capex_usd": 670465,
            "npv_usd": 1001826,
            "irr_pct": 24.9,
            "payback_years": 5,
            "annual_savings_usd": 164633,
            "co2_saved_tonnes_yr": 655.1,
            "lcoe_usd_kwh": 0.0504,
            "dscr_lender_pass": true,
            "viability": "strong"
        },
        {
            "load_profile": "agro_processing",
            "description": "Agricultural processing — milling, pumping, drying",
            "solar_coincidence_pct": 78,
            "diesel_displacement_pct": 75,
            "pv_capacity_kw": 636.5,
            "bess_energy_kwh": 400,
            "total_capex_usd": 684118,
            "npv_usd": 916151,
            "irr_pct": 23.4,
            "payback_years": 5,
            "annual_savings_usd": 158315,
            "co2_saved_tonnes_yr": 630,
            "lcoe_usd_kwh": 0.0534,
            "dscr_lender_pass": true,
            "viability": "strong"
        },
        {
            "load_profile": "manufacturing",
            "description": "Heavy industry — motors, compressors, process heat",
            "solar_coincidence_pct": 72,
            "diesel_displacement_pct": 72.9,
            "pv_capacity_kw": 689.5,
            "bess_energy_kwh": 400,
            "total_capex_usd": 729623,
            "npv_usd": 814913,
            "irr_pct": 21.3,
            "payback_years": 5,
            "annual_savings_usd": 154038,
            "co2_saved_tonnes_yr": 613,
            "lcoe_usd_kwh": 0.0586,
            "dscr_lender_pass": true,
            "viability": "strong"
        },
        {
            "load_profile": "retail_mall",
            "description": "Retail/mall — HVAC, lighting, escalators, refrigeration",
            "solar_coincidence_pct": 60,
            "diesel_displacement_pct": 72.9,
            "pv_capacity_kw": 827.4,
            "bess_energy_kwh": 720,
            "total_capex_usd": 958372,
            "npv_usd": 534764,
            "irr_pct": 15.9,
            "payback_years": 7,
            "annual_savings_usd": 153862,
            "co2_saved_tonnes_yr": 612.3,
            "lcoe_usd_kwh": 0.0772,
            "dscr_lender_pass": false,
            "viability": "equity_only"
        },
        {
            "load_profile": "cold_chain",
            "description": "Cold storage/refrigeration — near-constant baseload",
            "solar_coincidence_pct": 55,
            "diesel_displacement_pct": 64.7,
            "pv_capacity_kw": 902.6,
            "bess_energy_kwh": 540,
            "total_capex_usd": 960792,
            "npv_usd": 346492,
            "irr_pct": 13.9,
            "payback_years": 8,
            "annual_savings_usd": 136704,
            "co2_saved_tonnes_yr": 544,
            "lcoe_usd_kwh": 0.0869,
            "dscr_lender_pass": false,
            "viability": "marginal"
        },
        {
            "load_profile": "hospital",
            "description": "Healthcare facility — 24/7 critical load",
            "solar_coincidence_pct": 55,
            "diesel_displacement_pct": 65.8,
            "pv_capacity_kw": 902.6,
            "bess_energy_kwh": 720,
            "total_capex_usd": 1022909,
            "npv_usd": 295429,
            "irr_pct": 13.2,
            "payback_years": 8,
            "annual_savings_usd": 139078,
            "co2_saved_tonnes_yr": 553.4,
            "lcoe_usd_kwh": 0.0911,
            "dscr_lender_pass": false,
            "viability": "marginal"
        },
        {
            "load_profile": "telecoms_tower",
            "description": "Telecom base stations — near-constant 24/7 baseload",
            "solar_coincidence_pct": 50,
            "diesel_displacement_pct": 67,
            "pv_capacity_kw": 992.9,
            "bess_energy_kwh": 570,
            "total_capex_usd": 1048588,
            "npv_usd": 293042,
            "irr_pct": 13.1,
            "payback_years": 8,
            "annual_savings_usd": 141417,
            "co2_saved_tonnes_yr": 562.8,
            "lcoe_usd_kwh": 0.0917,
            "dscr_lender_pass": false,
            "viability": "marginal"
        },
        {
            "load_profile": "hotel",
            "description": "Hospitality — HVAC, kitchen, laundry, lighting",
            "solar_coincidence_pct": 55,
            "diesel_displacement_pct": 58.9,
            "pv_capacity_kw": 902.6,
            "bess_energy_kwh": 621.6,
            "total_capex_usd": 988952,
            "npv_usd": 175667,
            "irr_pct": 12,
            "payback_years": 9,
            "annual_savings_usd": 124334,
            "co2_saved_tonnes_yr": 494.8,
            "lcoe_usd_kwh": 0.0984,
            "dscr_lender_pass": false,
            "viability": "marginal"
        }
    ],
    "interpretation": "Sectors with high solar coincidence (manufacturing, commercial_office, agro_processing) perform best because PV output directly displaces load without BESS mediation. 24/7 loads (cold_chain, telecoms) require larger BESS to achieve the same displacement and typically need concessional debt terms to clear a 1.30x DSCR threshold.",
    "access": "entitled"
}
行业市场地图 - 国家筛选 — 代码片段

curl --location --request POST 'https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28878/sector+market+map+-+country+screen' --header 'Authorization: Bearer YOUR_API_KEY' 

--data-raw '{
  "country": "nigeria",
  "avg_daily_load_kwh": 2400,
  "nameplate_kva": 500,
  "load_fraction": 0.75,
  "target_diesel_displacement_pct": 70,
  "backup_hours_target": 4
}'

    
请求
对2至10个国家的相同负载配置进行并排比较——燃料基线、电网可靠性风险、主权税收激励、外汇波动——以帮助开发者决定首先进入哪个国家市场
Endpoint ID: 28879
POST https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28879/cross-border+investment+comparison
输入参数

跨境投资比较 — 端点功能

对象 描述
请求体 必需 Json

剩余免费测试请求:3 / 3。


输入参数

API 示例响应
JSON
{
    "status": "success",
    "api_version": "1.0.0",
    "load_profile": "manufacturing",
    "avg_daily_load_kwh": 2400,
    "top_country": "South Africa",
    "top_country_irr": 50.7,
    "top_country_caveat": null,
    "irr_leader_country": "South Africa",
    "irr_leader_irr": 50.7,
    "countries_ranked_by_irr": [
        {
            "country": "South Africa",
            "country_code": "south_africa",
            "diesel_price_usd_l": 1.1,
            "irradiance_kwh_m2_yr": 1950,
            "grid_availability_pct": 65,
            "diesel_displacement_pct": 72.9,
            "pv_capacity_kw": 621.5,
            "bess_energy_kwh": 400,
            "total_capex_usd": 671255,
            "npv_usd": 2430915,
            "irr_pct": 50.7,
            "payback_years": 2,
            "annual_savings_usd": 279836,
            "co2_saved_tonnes_yr": 613,
            "lcoe_usd_kwh": 0.0539,
            "diesel_allin_usd_kwh": 0.438,
            "dscr_lender_pass": true,
            "fx_risk_level": "MEDIUM",
            "irr_fx_downside_pct": 46.5,
            "viability": "excellent"
        },
        {
            "country": "Kenya",
            "country_code": "kenya",
            "diesel_price_usd_l": 1.05,
            "irradiance_kwh_m2_yr": 1750,
            "grid_availability_pct": 80,
            "diesel_displacement_pct": 72.9,
            "pv_capacity_kw": 699.5,
            "bess_energy_kwh": 400,
            "total_capex_usd": 738188,
            "npv_usd": 2060731,
            "irr_pct": 36.7,
            "payback_years": 3,
            "annual_savings_usd": 268400,
            "co2_saved_tonnes_yr": 613,
            "lcoe_usd_kwh": 0.0592,
            "diesel_allin_usd_kwh": 0.4201,
            "dscr_lender_pass": true,
            "fx_risk_level": "MEDIUM",
            "irr_fx_downside_pct": 33.7,
            "viability": "excellent"
        },
        {
            "country": "Ghana",
            "country_code": "ghana",
            "diesel_price_usd_l": 0.95,
            "irradiance_kwh_m2_yr": 1800,
            "grid_availability_pct": 70,
            "diesel_displacement_pct": 72.9,
            "pv_capacity_kw": 697.6,
            "bess_energy_kwh": 400,
            "total_capex_usd": 736616,
            "npv_usd": 1811400,
            "irr_pct": 33.7,
            "payback_years": 4,
            "annual_savings_usd": 245528,
            "co2_saved_tonnes_yr": 613,
            "lcoe_usd_kwh": 0.0591,
            "diesel_allin_usd_kwh": 0.3843,
            "dscr_lender_pass": true,
            "fx_risk_level": "MEDIUM",
            "irr_fx_downside_pct": 28.3,
            "viability": "excellent"
        },
        {
            "country": "Nigeria",
            "country_code": "nigeria",
            "diesel_price_usd_l": 0.55,
            "irradiance_kwh_m2_yr": 1850,
            "grid_availability_pct": 45,
            "diesel_displacement_pct": 72.9,
            "pv_capacity_kw": 689.5,
            "bess_energy_kwh": 400,
            "total_capex_usd": 729623,
            "npv_usd": 814913,
            "irr_pct": 21.3,
            "payback_years": 5,
            "annual_savings_usd": 154038,
            "co2_saved_tonnes_yr": 613,
            "lcoe_usd_kwh": 0.0586,
            "diesel_allin_usd_kwh": 0.2411,
            "dscr_lender_pass": true,
            "fx_risk_level": "HIGH",
            "irr_fx_downside_pct": 10.1,
            "viability": "strong"
        }
    ],
    "key_insight": "IRR is primarily driven by diesel price (revenue driver) and grid availability (determines backup need). High diesel + low grid = strongest case. Check FX risk before committing — NGN/ETB volatility can erode returns.",
    "access": "unauthenticated"
}
跨境投资比较 — 代码片段

curl --location --request POST 'https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28879/cross-border+investment+comparison' --header 'Authorization: Bearer YOUR_API_KEY' 

--data-raw '{
  "countries": ["nigeria", "south_africa", "kenya", "ghana"],
  "load_profile": "manufacturing",
  "avg_daily_load_kwh": 2400,
  "nameplate_kva": 500,
  "load_fraction": 0.75,
  "target_diesel_displacement_pct": 70,
  "backup_hours_target": 4
}'

    
请求
生成IFC绩效标准(PS1/PS2/PS3/PS6)预筛选清单 - 项目类别(A/B)、赤道原则层级和DFI资格列表 - 任何赤道原则银行或与IFC有关的贷款人所需的文件
Endpoint ID: 28880
GET https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28880/ifc+es+pre-screening+checklist
输入参数

IFC ES预筛查清单 — 端点功能

对象 描述
request_body 必需
请求体 必需 Json
country 必需 Country code to screen, e.g. nigeria
sector 必需 Sector/load profile to check, e.g. manufacturing
land_ha 可选 Estimated land area in hectares
has_bess 可选 Does the project include a BESS?

剩余免费测试请求:3 / 3。


输入参数

country
sector
land_ha
has_bess
API 示例响应
JSON
{
    "ifc_category": "B",
    "category_rationale": "Category B — site-specific, largely reversible impacts. Land area 0.5 ha.",
    "equator_principles_category": "EP Category B",
    "total_requirements": 11,
    "checklist": [
        {
            "performance_standard": "PS1",
            "requirement": "Environmental and Social Management System (ESMS)",
            "trigger": "always",
            "guidance": "Document policies and procedures for identifying/managing E&S risks. ISO 14001 certification acceptable as ESMS. IFC PS1 §14.",
            "status": "REQUIRED"
        },
        {
            "performance_standard": "PS1",
            "requirement": "Environmental and Social Management Plan (ESMP)",
            "trigger": "always",
            "guidance": "Project-specific ESMP covering construction, operations, decommissioning. IFC PS1 §25.",
            "status": "REQUIRED"
        },
        {
            "performance_standard": "PS1",
            "requirement": "Stakeholder Engagement Plan (SEP)",
            "trigger": "always",
            "guidance": "Community consultation records required. IFC PS1 §25-33. Must document free, prior and informed consultation for affected communities.",
            "status": "REQUIRED"
        },
        {
            "performance_standard": "PS1",
            "requirement": "Project-level grievance mechanism",
            "trigger": "always",
            "guidance": "Accessible, transparent mechanism for affected communities. IFC PS1 §35.",
            "status": "REQUIRED"
        },
        {
            "performance_standard": "PS2",
            "requirement": "Occupational Health and Safety (OHS) plan",
            "trigger": "always",
            "guidance": "Construction and O&M phase OHS. IFC/World Bank Group EHS Guidelines for Solar PV apply.",
            "status": "REQUIRED"
        },
        {
            "performance_standard": "PS2",
            "requirement": "Workers accommodation plan",
            "trigger": "workers_gt_50",
            "guidance": "Required if > 50 construction workers on site simultaneously. IFC PS2 §23-24.",
            "status": "REQUIRED"
        },
        {
            "performance_standard": "PS2",
            "requirement": "Child and forced labour prohibition — supply chain",
            "trigger": "always",
            "guidance": "Solar panel supply chain due diligence. Polysilicon sourcing audit recommended given Xinjiang provenance concerns (UFLPA 2022). IFC PS2 §17.",
            "status": "REQUIRED"
        },
        {
            "performance_standard": "PS3",
            "requirement": "Waste management plan — end-of-life panel disposal",
            "trigger": "always",
            "guidance": "Solar panel disposal plan at end of 25-yr life. WEEE directive compliance where applicable. LFP BESS: lower hazard than NMC but containment plan required. IFC PS3 §13.",
            "status": "REQUIRED"
        },
        {
            "performance_standard": "PS3",
            "requirement": "BESS hazardous materials management plan",
            "trigger": "bess",
            "guidance": "LFP chemistry: lower thermal runaway risk, but spill and fire management plan required. IFC EHS Guidelines for Electric Power Transmission and Distribution.",
            "status": "REQUIRED"
        },
        {
            "performance_standard": "PS3",
            "requirement": "Construction waste management",
            "trigger": "always",
            "guidance": "Concrete, steel, cable waste management. Country-specific landfill regulations apply.",
            "status": "REQUIRED"
        },
        {
            "performance_standard": "PS6",
            "requirement": "Protected area proximity check",
            "trigger": "ground_any",
            "guidance": "Additional disclosure requirements if within 10 km of IUCN Category I-IV protected area. IFC PS6 §17 and Equator Principles IV Annex B.",
            "status": "REQUIRED"
        }
    ],
    "dfi_eligibility": [
        "AfDB SEFA",
        "REPP",
        "USAID DCA",
        "Proparco",
        "IFC",
        "FMO"
    ],
    "disclaimer": "This is a pre-screening checklist only. A licensed E&S consultant must conduct the full ESIA/ESMP. Country-specific regulations may impose additional requirements beyond IFC Performance Standards.",
    "source": "IFC Performance Standards on Environmental and Social Sustainability (2012). IFC Project 49569 Botswana Solar Phase 2 ESRS (2024) — Category B C&I solar precedent. World Bank Equator Principles IV (2020). AfDB Integrated Safeguards System Category 2 (2013).",
    "api_version": "1.0.0",
    "access": "unauthenticated"
}
IFC ES预筛查清单 — 代码片段

curl --location --request GET 'https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28880/ifc+es+pre-screening+checklist?country=nigeria§or=manufacturing&land_ha=0.5&has_bess=true' --header 'Authorization: Bearer YOUR_API_KEY' 

--data-raw ''

    
请求
通过欧盟联合研究中心PVGIS-SARAH3卫星数据将GPS坐标转换为特定地点的年度太阳辐照度,修正最高20%的国家平均数据集所产生的过高估计——将结果输入整体承保模型,以实现现场准确的规模确定
Endpoint ID: 28881
POST https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28881/site-specific+solar+resource+assessment
输入参数

现场特定太阳能资源评估 — 端点功能

对象 描述
请求体 必需 Json

剩余免费测试请求:3 / 3。


输入参数

API 示例响应
JSON
{
    "irradiance_kwh_m2_yr": null,
    "specific_yield_kwh_kwp_yr": 1409.9,
    "optimal_tilt_deg": 10,
    "optimal_azimuth_deg": 29,
    "pvgis_database": "PVGIS-SARAH3",
    "coverage_years": "2005–2020 (15-year mean)",
    "lat": 6.5244,
    "lon": 3.3792,
    "source": "EU JRC PVGIS-SARAH3. Huld et al. (2012) Solar Energy 86:1803-1815. Satellite: Meteosat Prime, ~3 km resolution, 15-year average. CrossBoundary (2021) irradiance bias report — site-specific data eliminates systematic +20% overstatement in country-average datasets.",
    "access": "unauthenticated"
}
现场特定太阳能资源评估 — 代码片段

curl --location --request POST 'https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28881/site-specific+solar+resource+assessment' --header 'Authorization: Bearer YOUR_API_KEY' 

--data-raw '{
  "lat": 6.5244,
  "lon": 3.3792
}'

    
请求
每个国家的本地化参考数据 - 太阳辐照度基准 燃料价格 电网可靠性评级 和主权税收激励机制 - 所有计算的基准数据来源
Endpoint ID: 28882
GET https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28882/country+risk+and+incentive+data+sheet
输入参数

剩余免费测试请求:3 / 3。

此端点不需要任何输入参数。

API 示例响应
JSON
{
    "countries": [
        {
            "country_code": "nigeria",
            "country_name": "Nigeria",
            "irradiance_kwh_m2_yr": 1850,
            "grid_availability_pct": 45,
            "diesel_price_usd_l": 0.55,
            "grid_tariff_usd_kwh": 0.035,
            "currency": "NGN",
            "fx_volatility_annual_pct": 28,
            "ambient_temp_avg_c": 32,
            "incentives": {
                "pioneer_status": true,
                "pioneer_status_years": 3,
                "pioneer_cit_rate": 0.3,
                "import_duty_solar": 0,
                "vat_rate": 0.075,
                "carbon_credit_eligible": true
            },
            "incentive_source": "NIPC Act Cap N117 LFN 2004; NIPC Pioneer Status Instrument 2023",
            "source_irradiance": "NASA POWER MERRA-2; Fraunhofer ISE PV Report 2024",
            "source_diesel": "GIZ HERA (2019); NNPC pump price 2024",
            "source_grid": "ESMAP 2023; World Bank Nigeria Power Sector Brief"
        },
        {
            "country_code": "south_africa",
            "country_name": "South Africa",
            "irradiance_kwh_m2_yr": 1950,
            "grid_availability_pct": 65,
            "diesel_price_usd_l": 1.1,
            "grid_tariff_usd_kwh": 0.135,
            "currency": "ZAR",
            "fx_volatility_annual_pct": 14,
            "ambient_temp_avg_c": 22,
            "incentives": {
                "section_12b": true,
                "corporate_tax_rate": 0.27,
                "vat_rate": 0.15,
                "carbon_credit_eligible": true
            },
            "incentive_source": "SA Income Tax Act §12B (Act 58 of 1962, amended 2023)",
            "source_irradiance": "PVGIS-SARAH2 (EU JRC); GeoSUN Africa atlas",
            "source_diesel": "SAPIA 2024",
            "source_grid": "Eskom load-shedding statistics 2024; CSIR energy report"
        },
        {
            "country_code": "kenya",
            "country_name": "Kenya",
            "irradiance_kwh_m2_yr": 1750,
            "grid_availability_pct": 80,
            "diesel_price_usd_l": 1.05,
            "grid_tariff_usd_kwh": 0.22,
            "currency": "KES",
            "fx_volatility_annual_pct": 10,
            "ambient_temp_avg_c": 24,
            "incentives": {
                "vat_exempt_solar": true,
                "import_duty_solar": 0,
                "corporate_tax_rate": 0.3,
                "vat_rate": 0.16,
                "net_metering": true,
                "carbon_credit_eligible": true
            },
            "incentive_source": "East African VAT Act (2013) Schedule 1; Kenya Energy Act 2019",
            "source_irradiance": "PVGIS-SARAH2; Kenya Meteorological Department",
            "source_diesel": "EPRA 2024",
            "source_grid": "ESMAP 2023; KPLC outage statistics"
        },
        {
            "country_code": "ghana",
            "country_name": "Ghana",
            "irradiance_kwh_m2_yr": 1800,
            "grid_availability_pct": 70,
            "diesel_price_usd_l": 0.95,
            "grid_tariff_usd_kwh": 0.18,
            "currency": "GHS",
            "fx_volatility_annual_pct": 18,
            "ambient_temp_avg_c": 29,
            "incentives": {
                "free_zone_exemption": true,
                "import_duty_solar": 0,
                "corporate_tax_rate": 0.25,
                "vat_rate": 0.125,
                "carbon_credit_eligible": true
            },
            "incentive_source": "GIPC Act 2013; Ghana RE Act 832 2011",
            "source_irradiance": "PVGIS-SARAH2; Ghana Energy Commission",
            "source_diesel": "NPA Ghana 2024",
            "source_grid": "ESMAP 2023; GRIDCo"
        },
        {
            "country_code": "egypt",
            "country_name": "Egypt",
            "irradiance_kwh_m2_yr": 2200,
            "grid_availability_pct": 88,
            "diesel_price_usd_l": 0.38,
            "grid_tariff_usd_kwh": 0.055,
            "currency": "EGP",
            "fx_volatility_annual_pct": 22,
            "ambient_temp_avg_c": 28,
            "incentives": {
                "free_zone_exemption": true,
                "import_duty_solar": 0.02,
                "corporate_tax_rate": 0.225,
                "vat_rate": 0.05,
                "net_metering": true,
                "carbon_credit_eligible": true
            },
            "incentive_source": "Egypt Investment Law 72/2017; NREA Net Metering Decree 2013; reduced 5% VAT rate on renewable energy equipment per Egyptian VAT Law amendments — verify current rate with in-country tax adviser before underwriting.",
            "source_irradiance": "PVGIS-SARAH2; NREA Egypt solar atlas",
            "source_diesel": "EGPC 2024",
            "source_grid": "ESMAP 2023; EETC annual report"
        },
        {
            "country_code": "tanzania",
            "country_name": "Tanzania",
            "irradiance_kwh_m2_yr": 1900,
            "grid_availability_pct": 50,
            "diesel_price_usd_l": 1.15,
            "grid_tariff_usd_kwh": 0.12,
            "currency": "TZS",
            "fx_volatility_annual_pct": 8,
            "ambient_temp_avg_c": 27,
            "incentives": {
                "corporate_tax_rate": 0.3,
                "vat_rate": 0.18,
                "vat_exempt_solar": true,
                "import_duty_solar": 0,
                "carbon_credit_eligible": true
            },
            "incentive_source": "Tanzania VAT Act Cap 148; Tanzania Energy Policy 2015",
            "source_irradiance": "PVGIS-SARAH2; Tanzania Meteorological Authority",
            "source_diesel": "EWURA 2024",
            "source_grid": "ESMAP 2023; TANESCO reliability statistics"
        },
        {
            "country_code": "ethiopia",
            "country_name": "Ethiopia",
            "irradiance_kwh_m2_yr": 1950,
            "grid_availability_pct": 55,
            "diesel_price_usd_l": 0.7,
            "grid_tariff_usd_kwh": 0.04,
            "currency": "ETB",
            "fx_volatility_annual_pct": 15,
            "ambient_temp_avg_c": 25,
            "incentives": {
                "investment_incentive": true,
                "import_duty_solar": 0,
                "corporate_tax_rate": 0.3,
                "vat_rate": 0.15,
                "carbon_credit_eligible": true
            },
            "incentive_source": "Ethiopia Investment Proclamation 1180/2020",
            "source_irradiance": "PVGIS-SARAH2; Ethiopian Meteorological Institute",
            "source_diesel": "Ethiopian Petroleum Supply Enterprise 2024",
            "source_grid": "ESMAP 2023; EEU statistics"
        },
        {
            "country_code": "zambia",
            "country_name": "Zambia",
            "irradiance_kwh_m2_yr": 1900,
            "grid_availability_pct": 50,
            "diesel_price_usd_l": 1.2,
            "grid_tariff_usd_kwh": 0.08,
            "currency": "ZMW",
            "fx_volatility_annual_pct": 20,
            "ambient_temp_avg_c": 25,
            "incentives": {
                "zda_registered": true,
                "import_duty_solar": 0,
                "corporate_tax_rate": 0.3,
                "vat_rate": 0.16,
                "carbon_credit_eligible": true
            },
            "incentive_source": "Zambia Mines and Minerals Development Act; ZDA Act 2006",
            "source_irradiance": "PVGIS-SARAH2; ZESCO solar resource data",
            "source_diesel": "ERB Zambia 2024",
            "source_grid": "ESMAP 2023; ZESCO load-shedding statistics"
        },
        {
            "country_code": "senegal",
            "country_name": "Senegal",
            "irradiance_kwh_m2_yr": 1900,
            "grid_availability_pct": 72,
            "diesel_price_usd_l": 1.25,
            "grid_tariff_usd_kwh": 0.19,
            "currency": "XOF",
            "fx_volatility_annual_pct": 4,
            "ambient_temp_avg_c": 30,
            "incentives": {
                "investment_code": true,
                "import_duty_solar": 0,
                "corporate_tax_rate": 0.3,
                "vat_rate": 0.18,
                "carbon_credit_eligible": true
            },
            "incentive_source": "Senegal Investment Code Law 2004-06; CRSE RE regulations",
            "source_irradiance": "PVGIS-SARAH2; ASER solar atlas Senegal",
            "source_diesel": "SENELEC / SAR pump price 2024",
            "source_grid": "ESMAP 2023; SENELEC outage data"
        },
        {
            "country_code": "morocco",
            "country_name": "Morocco",
            "irradiance_kwh_m2_yr": 2100,
            "grid_availability_pct": 92,
            "diesel_price_usd_l": 1.05,
            "grid_tariff_usd_kwh": 0.13,
            "currency": "MAD",
            "fx_volatility_annual_pct": 5,
            "ambient_temp_avg_c": 22,
            "incentives": {
                "investment_charter": true,
                "net_metering": true,
                "import_duty_solar": 0.025,
                "corporate_tax_rate": 0.28,
                "vat_rate": 0.2,
                "carbon_credit_eligible": true
            },
            "incentive_source": "Morocco Investment Charter 2022; Law 13-09 RE framework",
            "source_irradiance": "PVGIS-SARAH2; MASEN",
            "source_diesel": "ONHYM 2024",
            "source_grid": "ESMAP 2023; ONEE annual report"
        }
    ],
    "_note": "Response truncated for documentation purposes"
}
国家风险和激励数据表 — 代码片段

curl --location --request GET 'https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28882/country+risk+and+incentive+data+sheet' --header 'Authorization: Bearer YOUR_API_KEY' 


    
请求
适用于所有8个支持行业的小时负荷曲线库——太阳能重合曲线、预期电池储能系统循环行为和峰值需求窗口——用于在进行全面分析之前验证输入
Endpoint ID: 28883
GET https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28883/sector+load+profile+library
输入参数

剩余免费测试请求:3 / 3。

此端点不需要任何输入参数。

API 示例响应
JSON
{
    "load_profiles": [
        {
            "profile_code": "manufacturing",
            "description": "Heavy industry — motors, compressors, process heat",
            "peak_window": "08:00-18:00",
            "load_factor": 0.75,
            "daily_peak_hours": 10,
            "daytime_fraction_pct": 65,
            "solar_coincidence_pct": 72,
            "bess_benefit_factor": 0.6,
            "bess_daily_cycles": 0.8,
            "source": "GIZ HERA (2019); RMI Unlocking C&I Solar Nigeria (2024)"
        },
        {
            "profile_code": "commercial_office",
            "description": "Office buildings — HVAC, lighting, computers",
            "peak_window": "09:00-17:00",
            "load_factor": 0.65,
            "daily_peak_hours": 9,
            "daytime_fraction_pct": 72,
            "solar_coincidence_pct": 80,
            "bess_benefit_factor": 0.4,
            "bess_daily_cycles": 0.6,
            "source": "ASHRAE 90.1-2022 commercial load profiles; GIZ HERA"
        },
        {
            "profile_code": "retail_mall",
            "description": "Retail/mall — HVAC, lighting, escalators, refrigeration",
            "peak_window": "10:00-22:00",
            "load_factor": 0.7,
            "daily_peak_hours": 14,
            "daytime_fraction_pct": 55,
            "solar_coincidence_pct": 60,
            "bess_benefit_factor": 0.75,
            "bess_daily_cycles": 1,
            "source": "GIZ HERA (2019); NREL Commercial Building Energy Database"
        },
        {
            "profile_code": "cold_chain",
            "description": "Cold storage/refrigeration — near-constant baseload",
            "peak_window": "00:00-24:00",
            "load_factor": 0.85,
            "daily_peak_hours": 24,
            "daytime_fraction_pct": 50,
            "solar_coincidence_pct": 55,
            "bess_benefit_factor": 0.9,
            "bess_daily_cycles": 1.1,
            "source": "IIR 2022; GIZ HERA"
        },
        {
            "profile_code": "telecoms_tower",
            "description": "Telecom base stations — near-constant 24/7 baseload",
            "peak_window": "00:00-24:00",
            "load_factor": 0.9,
            "daily_peak_hours": 24,
            "daytime_fraction_pct": 50,
            "solar_coincidence_pct": 50,
            "bess_benefit_factor": 0.95,
            "bess_daily_cycles": 1.2,
            "source": "GSMA Green Power for Mobile (2015); IHS Towers energy data"
        },
        {
            "profile_code": "hospital",
            "description": "Healthcare facility — 24/7 critical load",
            "peak_window": "06:00-22:00",
            "load_factor": 0.8,
            "daily_peak_hours": 24,
            "daytime_fraction_pct": 48,
            "solar_coincidence_pct": 55,
            "bess_benefit_factor": 1,
            "bess_daily_cycles": 1,
            "source": "WHO Health Facility Energy Standards; GIZ HERA"
        },
        {
            "profile_code": "hotel",
            "description": "Hospitality — HVAC, kitchen, laundry, lighting",
            "peak_window": "07:00-23:00",
            "load_factor": 0.6,
            "daily_peak_hours": 16,
            "daytime_fraction_pct": 45,
            "solar_coincidence_pct": 55,
            "bess_benefit_factor": 0.7,
            "bess_daily_cycles": 0.9,
            "source": "IFC Hotel Sustainability Baseline (2023); GIZ HERA"
        },
        {
            "profile_code": "agro_processing",
            "description": "Agricultural processing — milling, pumping, drying",
            "peak_window": "07:00-17:00",
            "load_factor": 0.7,
            "daily_peak_hours": 10,
            "daytime_fraction_pct": 70,
            "solar_coincidence_pct": 78,
            "bess_benefit_factor": 0.45,
            "bess_daily_cycles": 0.5,
            "source": "FAO Agro-Processing Energy Handbook (2021); GIZ HERA"
        }
    ],
    "interpretation": {
        "solar_coincidence_pct": "Fraction of solar output that coincides with load demand. Higher = more direct solar consumption, smaller BESS needed. Manufacturing (72%) is good; cold_chain (55%) is poor — needs more BESS.",
        "bess_benefit_factor": "How much BESS improves diesel displacement for this profile. 1.0 = critical (hospital, telecom); 0.4 = BESS adds little value.",
        "bess_daily_cycles": "Profile-specific daily cycle rate used to calculate BESS effective life and LCOS. Range 0.5 (agro-processing) to 1.2 (telecoms). Effective life = min(calendar=15yr, 3500 cycles / (cycles/day × 365))."
    },
    "source": "GIZ HERA (2019); GSMA Green Power for Mobile (2015); ASHRAE 90.1-2022; RMI Africa (2024)"
}
行业负载特征库 — 代码片段

curl --location --request GET 'https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28883/sector+load+profile+library' --header 'Authorization: Bearer YOUR_API_KEY' 


    
请求
基准系统资本支出基准用于光伏阵列、电池存储和备份集成成本,来源于NREL ATB — 用于与市场价格进行引用安装商定价的对比检查
Endpoint ID: 28884
GET https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28884/capex+benchmark+reference
输入参数

剩余免费测试请求:3 / 3。

此端点不需要任何输入参数。

API 示例响应
JSON
{
    "pv_capex_usd_wdc": {
        "small_under_50kw": 1.05,
        "medium_50_500kw": 0.9,
        "large_500kw_5mw": 0.78,
        "utility_over_5mw": 0.68,
        "africa_premium_note": "20–30% premium over NREL ATB 2024 US baseline applied for: freight/import duties (~10%), local installation markup (~10%), contingency (~5–10%). Actual quotes vary by country and port logistics.",
        "source": "NREL ATB 2024 Commercial PV; Wood Mackenzie Africa Solar (2024)"
    },
    "bess_capex": {
        "pack_cost_usd_kwh": 180,
        "bos_cost_usd_kw": 120,
        "formula": "CAPEX = (pack_cost × nameplate_kWh) + (BOS_cost × power_kW)",
        "chemistry": "LFP (Lithium Iron Phosphate) — dominant Africa C&I 2024",
        "lcos_benchmark_usd_mwh": "USD 160–250/MWh (PNNL-33283; BloombergNEF 2024)",
        "cycle_note": "BESS effective life uses profile-specific daily cycle rate. Cold-chain and telecoms cycle faster, giving shorter life and higher LCOS.",
        "source": "NREL ATB 2024 Storage Appendix; BloombergNEF BESS Price Survey 2024; Mongird et al. (2022) PNNL-33283"
    },
    "generator_costs": {
        "maintenance_usd_kwh": 0.015,
        "replacement_usd_kva": 350,
        "life_hours": 20000,
        "minimum_load_pct": 30,
        "wet_stack_warning": "Load < 30% risks wet-stacking — unburnt fuel in exhaust (Cummins 2002)",
        "fuel_curve_standard": "ISO 8528-1:2005 §13",
        "source": "GIZ HERA (2019); ISO 8528-1:2005; Cummins Power Generation (2002)"
    },
    "contingency": {
        "construction_contingency_pct": 10,
        "annual_insurance_pct": 0.5,
        "note": "Both included in all /analyse/* CAPEX totals."
    }
}
CAPEX基准参考 — 代码片段

curl --location --request GET 'https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28884/capex+benchmark+reference' --header 'Authorization: Bearer YOUR_API_KEY' 


    
请求
每个计算模块及其适用标准的完整技术披露 — 调度逻辑、退化曲线、DSCR 方法论、碳核算 — 并附有主要来源引用,以供审计模型的尽职调查团队使用
Endpoint ID: 28885
GET https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28885/engineering+and+financial+methodology+disclosure
输入参数

剩余免费测试请求:3 / 3。

此端点不需要任何输入参数。

API 示例响应
JSON
{
    "title": "Diesel-to-Solar Hybrid Feasibility API — Engineering Methodology v1.0",
    "version": "1.0.0",
    "modules": [
        {
            "module": "1. Diesel Baseline",
            "method": "ISO 8528-1:2005 §13 two-term load curve: L/hr = 0.084 × P_rated_kW + 0.246 × P_load_kW. All-in cost = fuel + maintenance ($0.015/kWh) + replacement amortisation.",
            "sources": [
                "ISO 8528-1:2005 §13",
                "GIZ HERA (2019)",
                "Wood Mackenzie Africa (2022)"
            ]
        },
        {
            "module": "2. Solar Sizing",
            "method": "PV sized so that: solar_coincidence × PV_output / annual_load = target_fraction. Specific yield = PVGIS irradiance × PR=0.78 × thermal_derating_factor. Thermal derating: Pmax_coeff = -0.45%/°C; cell_temp = ambient + 25°C (NOCT). Inverter clipping modelled at DC:AC = 1.20.",
            "sources": [
                "Neubauer & Simpson (2015) NREL/TP-5400-63162 §3.2",
                "PVGIS-SARAH2 (EU JRC)",
                "Fraunhofer ISE PV Report 2024 (Africa PR=0.78)",
                "King et al. (2004) NREL Sandia PV model",
                "IEC 61215:2021 §11.5"
            ]
        },
        {
            "module": "3. BESS Sizing",
            "method": "Usable energy = max(backup_target, evening_load × bess_benefit_factor). Nameplate = usable / (DoD × RTE). CAPEX = (pack × nameplate_kWh) + (BOS × power_kW). Effective life = min(calendar_life=15yr, 3500_cycles / (profile_cycles_per_day × 365)). SOH degradation: linear 100% → 80% over effective life.",
            "sources": [
                "NREL ATB 2024 Storage Appendix",
                "Mongird et al. (2022) PNNL-33283 §5.1",
                "BloombergNEF BESS Price Survey 2024",
                "CATL LFP datasheet"
            ]
        },
        {
            "module": "4. Dispatch Model",
            "method": "HOMER-equivalent annual merit-order: (1) Solar AC → direct load (up to daytime load), (2) Surplus → BESS, (3) BESS → evening/night load, (4) Generator → balance. PV is sized accounting for sector solar coincidence; dispatch uses AC output directly.",
            "sources": [
                "Lambert et al. (2006) HOMER Energy LLC",
                "IEEE Std 1562-2007"
            ]
        },
        {
            "module": "5. Financial Model",
            "method": "25-yr NPV/IRR. Revenue = displaced_kWh × diesel_allin_cost. PV degrades 0.5%/yr. Diesel escalates 3%/yr. O&M 2%/yr. Insurance 0.5%/yr of asset. 10% construction contingency on CAPEX. LCOE = NPV(costs) / NPV(energy_delivered). IRR via bisection. O&M blended rate = weighted average (pv_frac × PV_OM + bess_frac × BESS_OM).",
            "sources": [
                "IRENA (2023) Renewable Power Generation Costs §4",
                "Jordan & Kurtz (2013) NREL/TP-5200-51664",
                "IEA Africa Energy Outlook (2023)",
                "IFC (2023) Mobilizing Private Investment in Clean Energy Africa"
            ]
        },
        {
            "module": "6. Tax Incentives",
            "method": "SA §12B: capacity-gated — 100% yr-1 depreciation × CIT 27% applies only to solar PV systems at or below 1 MW (nameplate_kva used as a kW proxy); systems above 1 MW, and all non-PV renewable technologies, follow the general §12B(2) 50%/30%/20% three-year schedule instead. Trade-use requirement satisfied by construction — this engine models commercial/industrial load profiles only, never residential. Self-assessed; no discretionary approval required to claim, unlike the two categories below. Nigeria NIPC: 3-yr income tax holiday on net profit (PV of tax savings) — requires pioneer_status_confirmed=true; not applied by default. Kenya: VAT exemption on solar equipment (70% of CAPEX). Ghana Free Zones: 10-yr CIT holiday on net profit — requires free_zone_registered=true; not applied by default. Egypt/Morocco/Zambia: 10-yr accelerated depreciation. Senegal/Ethiopia: investment code accelerated depreciation.",
            "sources": [
                "SA Income Tax Act §12B(1)(h) and §12B(2) (Act 58 of 1962, amended); SARS draft guide 'Allowances and deductions relating to assets used in the generation of electricity' (30 July 2024)",
                "NIPC Act Cap N117 LFN 2004; NIPC Pioneer Status Instrument 2023",
                "Kenya VAT Act Schedule 1 (East African VAT Act 2013)",
                "Ghana Free Zones Act 1995 (Act 504) §26; GIPC Act 2013",
                "Egypt Investment Law 72/2017; Morocco Investment Charter 2022"
            ]
        },
        {
            "module": "7. CO2 and Carbon Credits",
            "method": "Diesel saved (litres) = displaced_kWh × ISO 8528-1 fuel curve. CO2 = litres × 2.68 kgCO2/L (IPCC 2006). Carbon revenue = CO2_t × credit_price × (1 - broker_fee). VCS: $12/t; Gold Standard: $15/t; 10% brokerage.",
            "sources": [
                "IPCC 2006 Guidelines Vol 2 Ch1 Table 1.4",
                "EPA GHG Emission Factors Hub (2024)",
                "Verra VCS VM0038 v1.0 (2020)",
                "Gold Standard AMS-I.D. v18",
                "BeZero Carbon Africa pricing Q1 2024"
            ]
        },
        {
            "module": "8. DSCR Model",
            "method": "Debt Service Coverage Ratio = NOI / Annual_Debt_Service. Mortgage-style amortisation. Computed for each year over loan tenor. Minimum DSCR over tenor determines lender bankability (threshold: 1.30). Default terms: 70% LTV, 10-yr, 12% — IFC Africa C&I benchmark. SCOPE: models non-recourse, SPV-style project finance — debt sized and covenanted against isolated project CFADS. Not a corporate/balance-sheet-recourse lending model; corporate lenders underwrite against consolidated financials and credit rating, a different methodology this engine does not implement.",
            "sources": [
                "IFC (2023) Mobilizing Private Investment in Clean Energy Africa",
                "World Bank ESMAP project finance guidelines (2022)"
            ]
        },
        {
            "module": "9. Sensitivity Analysis",
            "method": "One-way sensitivity: diesel price (±20%, +40%), CAPEX (±10%, +20%), NPV at discount rates (8/10/12/15%). IRR is reported as constant across discount rate scenarios — it is a property of cashflows only, independent of discount rate. One variable moved at a time; all others at base.",
            "sources": [
                "IRENA (2023) risk framework",
                "IFC stress-test protocol (2023)"
            ]
        }
    ],
    "verification": {
        "diesel_cost": "Cross-check fuel consumption at ISO 8528-1 tables",
        "irradiance": "Cross-check at re.jrc.ec.europa.eu/pvg_tools (PVGIS)",
        "bess_lcos": "Compare to PNNL-33283 Fig. 4 — LFP range $160–250/MWh",
        "pv_capex": "Compare to NREL ATB 2024 atb.nrel.gov Commercial PV mid-case",
        "carbon_price": "Check BeZero Carbon Africa report or Xpansiv CBL spot market"
    },
    "disclaimer": "All outputs are pre-feasibility estimates for site screening, not engineered designs. Commission a licensed electrical engineer (IEC 62548 / NEC 690) and a registered financial adviser before procurement or investment commitment."
}
工程与财务方法论披露 — 代码片段

curl --location --request GET 'https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28885/engineering+and+financial+methodology+disclosure' --header 'Authorization: Bearer YOUR_API_KEY' 


    
请求
计算引擎的版本历史,确认向后兼容性,并记录每个版本中的更改 — 供集成商随时间跟踪API稳定性使用
Endpoint ID: 28886
GET https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28886/version+history+and+release+notes
输入参数

剩余免费测试请求:3 / 3。

此端点不需要任何输入参数。

API 示例响应
JSON
{
    "api_version": "1.0.0",
    "release_note": "v1.0.0 initial release. The feature list below documents what the engine does and why, not a sequence of prior public releases — there is no earlier public API version this replaces.",
    "features": [
        {
            "id": "1",
            "area": "GPS → PVGIS-SARAH3 irradiance lookup",
            "endpoint": "POST /site/irradiance",
            "description": "Fetch site-specific annual irradiance from GPS lat/lon using EU JRC PVGIS-SARAH3 (15-year Meteosat satellite data, ~3 km resolution, 2005–2020). CrossBoundary (2021) found generic datasets overstate Africa irradiance by up to 20%, causing 1–2% IRR overstatement. This eliminates that bias. Source: Huld et al. (2012) Solar Energy 86:1803-1815."
        },
        {
            "id": "2",
            "area": "PPA / Energy-as-a-Service model",
            "endpoint": "POST /analyse/ppa",
            "description": "Dual-mode analysis: PPA (developer IRR from tariff cashflows) vs CAPEX ownership. Returns developer IRR, break-even tariff, customer savings vs diesel, 25-year PPA revenue. Template: CrossBoundary EaaS — $707M portfolio, 20 countries. Source: IFC (2023) §3.2; CrossBoundary portfolio data (2025)."
        },
        {
            "id": "3",
            "area": "Three-scenario investment analysis",
            "endpoint": "POST /analyse/scenarios",
            "description": "Conservative (P90 irradiance, diesel −20%, CAPEX +15%) / Base / Optimistic scenarios run in parallel. Returns side-by-side IRR/NPV/DSCR table and investment decision string (INVEST / PROCEED / MARGINAL / DO NOT PROCEED). Source: IRENA (2023) §4.6; IFC stress-test; Arcadis (2025); IEA PVPS Task 13 (2024)."
        },
        {
            "id": "4",
            "area": "IFC PS1 E&S pre-screening checklist",
            "endpoint": "GET /screen/es-checklist",
            "description": "Generates IFC Performance Standards PS1/PS2/PS3/PS6 checklist with IFC project category, Equator Principles category, DFI eligibility list. Required for any Equator Principles or IFC-affiliated DFI financing. Source: IFC PS (2012); IFC Project 49569 ESRS (2024); EP IV (2020)."
        },
        {
            "id": "5",
            "area": "DSCR covenant compliance table (all responses)",
            "description": "run_hybrid_analysis returns dscr.covenant_table — year-by-year DSCR across the loan tenor with IFC covenant flags (1.30 minimum, 1.20 lock-up, 1.05 default), bankability score, and distribution restriction flags. Assumes non-recourse, SPV-style project finance — see GET /reference/methodology, module 8, for scope. Source: GreenBridge Infrastructure (2025); IFC (2023) §4.3; ESMAP (2022) §6."
        },
        {
            "id": "6",
            "area": "Break-even & P90 fields in sensitivity (all responses)",
            "description": "sensitivity.breakeven is included in all /analyse/* responses: break-even diesel price, break-even CAPEX overrun %, P90 IRR, P90 NPV, grid tariff crossover. Source: IEA PVPS Task 13 (2024); IRENA (2023) §4.6; Arcadis (2025)."
        },
        {
            "id": "7",
            "area": "Discount rate sensitivity — NPV table",
            "description": "Discount rate sensitivity reports NPV at 8/10/12/15% alongside IRR. IRR is correctly shown as constant across the sweep — it is a cashflow property independent of discount rate; only NPV varies."
        },
        {
            "id": "8",
            "area": "Tax incentives — Ghana, Egypt, Morocco, Zambia",
            "description": "Ghana: Free Zones Act §26 model, 10-year CIT holiday on net profit for qualifying Free Zone Enterprise registrations only — zero automatic benefit outside a free zone. Egypt/Morocco/Zambia: investment charter / ZEMA 10-year accelerated depreciation. Source: Ghana Free Zones Act 1995 (Act 504) §26; GIPC Act 2013; Egypt Investment Law 72/2017; Morocco Investment Charter 2022; ZDA Act 2006."
        },
        {
            "id": "9",
            "area": "South Africa §12B — capacity-gated tax treatment",
            "description": "100% Year-1 write-off applies only to solar PV systems at or below 1 MW. Systems above 1 MW, and non-PV renewable technologies, use the general §12B(2) 50%/30%/20% three-year schedule instead — not a flat rate regardless of size. See GET /reference/methodology, module 6, for the statute citation and disclosed assumptions."
        }
    ],
    "engineering_methodology": "See GET /reference/methodology for the full citation list."
}
版本历史和发布说明 — 代码片段

curl --location --request GET 'https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28886/version+history+and+release+notes' --header 'Authorization: Bearer YOUR_API_KEY' 


    
请求
返回API的操作状态、当前版本号以及当前支持的国家和行业列表。使用此信息在发送分析请求之前确认API是否可访问,或用于正常运行时间监控
Endpoint ID: 28887
GET https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28887/system+status+and+health+monitor
输入参数

剩余免费测试请求:3 / 3。

此端点不需要任何输入参数。

API 示例响应
JSON
{
    "status": "ok",
    "api": "Diesel-to-Solar Hybrid Feasibility API",
    "version": "1.0.0",
    "ts": "2026-08-03T18:19:43Z",
    "keep_alive": {
        "last_ping_time": "2026-08-03 18:19:42 UTC",
        "last_ping_result": "ok_200",
        "consecutive_failures": 0
    },
    "countries_supported": 10,
    "sectors_supported": 8,
    "new_in_v3": [
        "POST /site/irradiance — GPS→PVGIS-SARAH3",
        "POST /analyse/ppa — PPA vs CAPEX dual mode",
        "POST /analyse/scenarios — 3-scenario IC table",
        "GET /screen/es-checklist — IFC PS1 E&S checklist",
        "dscr.covenant_table — year-by-year covenant flags in all responses",
        "sensitivity.breakeven — P90 IRR/NPV and break-even fields in all responses"
    ],
    "new_in_v3_1": [
        "structural_prescreen — BIPV mounting load pre-screen on every analysis response",
        "EN 1991-1-4:2005 wind pressure, dead load, ULS combinations, bracket pull-out",
        "Seismic, cyclone, high-wind, altitude flags per country",
        "Corner Zone F vs central Zone H bracket loads reported separately",
        "structural_overrides parameter on /analyse/quick and /analyse/full"
    ]
}
系统状态和健康监测 — 代码片段

curl --location --request GET 'https://zylalabs.com/api/13409/lender-ready+financial+modelling+api+for+hybrid+systems/28887/system+status+and+health+monitor' --header 'Authorization: Bearer YOUR_API_KEY' 


    

API 访问密钥和身份验证

注册后,每个开发者都会被分配一个个人 API 访问密钥,这是一个唯一的字母和数字组合,用于访问我们的 API 端点。要使用 混合系统的贷方准备财务建模API API 进行身份验证,只需在 Authorization 标头中包含您的 bearer token。

标头
标头 描述
授权 必需 应为 Bearer access_key. 订阅后,请查看上方的"您的 API 访问密钥"。

无长期承诺。随时升级、降级或取消。 免费试用包括最多 50 个请求。

🚀 企业版套餐

起价
$ 10,000/年


  • 自定义数量
  • 自定义速率限制
  • 专业客户支持
  • 实时 API 监控

概览

工程级API用于非洲商业和工业市场的快速太阳能、电池、柴油混合可行性财务建模和准备贷款人的项目筛选

混合系统的贷方准备财务建模API API FAQs

每个端点返回与太阳能混合可行性相关的结构化数据,包括财务指标、减排和工程评估。例如,快速太阳能混合可行性分析返回的指标包括平均每日负载、柴油替代百分比以及财务绩效指标,如DSCR和IRR

关键字段包括“状态”、“api_version”、“输入”(用户参数)、“国家背景”(当地条件)和“柴油基线”(成本和消费)例如,完整的贷款人级别混合分析包括现金流细节和投资指标,如净现值和回收年限

参数因端点而异,但通常包括“国家”、“负载配置”、“平均每日负载千瓦时”和“目标位移百分比”。用户可以通过调整这些参数来自定义请求,以反映特定项目需求,例如不同工业的负载配置

响应数据以JSON格式组织,包含输入参数、国家背景和分析结果的部分。每个部分都有清晰的标签,方便用户轻松找到特定信息,例如财务指标或环境影响数据

数据来源包括可靠的组织和研究,例如NASA POWER GIZ HERA和NREL 每个端点的响应通常引用这些来源 确保用于计算和评估的数据的透明性和可靠性

典型的用例包括太阳能混合项目的可行性评估 投资者的财务建模以及开发者的投资组合筛选 用户可以利用数据评估项目的可行性 比较不同地点或结构电力购买协议

用户可以分析返回的数据,以便对项目投资做出明智的决策,评估财务可行性,并识别潜在风险。例如,理解债务服务覆盖率和内部收益率可以帮助确定项目在进行详细工程之前的银行贷款可行性

通过使用已建立的方法和标准,例如ISO指南和同行评审的来源,维护数据的准确性 定期更新和质量检查确保数据反映当前市场状况和技术进步

一般常见问题

Zyla API Hub 就像一个大型 API 商店,您可以在一个地方找到数千个 API。我们还为所有 API 提供专门支持和实时监控。注册后,您可以选择要使用的 API。请记住,每个 API 都需要自己的订阅。但如果您订阅多个 API,您将为所有这些 API 使用相同的密钥,使事情变得更简单。
价格以 USD(美元)、EUR(欧元)、CAD(加元)、AUD(澳元)和 GBP(英镑)列出。我们接受所有主要的借记卡和信用卡。我们的支付系统使用最新的安全技术,由 Stripe 提供支持,Stripe 是世界上最可靠的支付公司之一。如果您在使用卡片付款时遇到任何问题,请通过 [email protected]

此外,如果您已经以这些货币中的任何一种(USD、EUR、CAD、AUD、GBP)拥有有效订阅,该货币将保留用于后续订阅。只要您没有任何有效订阅,您可以随时更改货币。
定价页面上显示的本地货币基于您 IP 地址的国家/地区,仅供参考。实际价格以 USD(美元)为单位。当您付款时,即使您在我们的网站上看到以本地货币显示的等值金额,您的卡片对账单上也会以美元显示费用。这意味着您不能直接使用本地货币付款。
有时,银行可能会因其欺诈保护设置而拒绝收费。我们建议您首先联系您的银行,检查他们是否阻止了我们的收费。此外,您可以访问账单门户并更改关联的卡片以进行付款。如果这些方法不起作用并且您需要进一步帮助,请通过 [email protected]
价格由月度或年度订阅决定,具体取决于所选计划。
API 调用根据成功请求从您的计划中扣除。每个计划都包含您每月可以进行的特定数量的调用。只有成功的调用(由状态 200 响应指示)才会计入您的总数。这确保失败或不完整的请求不会影响您的月度配额。
Zyla API Hub 采用月度订阅系统。您的计费周期将从您购买付费计划的那一天开始,并在下个月的同一日期续订。因此,如果您想避免未来的费用,请提前取消订阅。
要升级您当前的订阅计划,只需转到 API 的定价页面并选择您要升级到的计划。升级将立即生效,让您立即享受新计划的功能。请注意,您之前计划中的任何剩余调用都不会转移到新计划,因此在升级时请注意这一点。您将被收取新计划的全部金额。
要检查您本月剩余多少 API 调用,请参考响应标头中的 "X-Zyla-API-Calls-Monthly-Remaining" 字段。例如,如果您的计划允许每月 1,000 个请求,而您已使用 100 个,则响应标头中的此字段将显示 900 个剩余调用。
要查看您的计划允许的最大 API 请求数,请检查 "X-Zyla-RateLimit-Limit" 响应标头。例如,如果您的计划包括每月 1,000 个请求,此标头将显示 1,000。
"X-Zyla-RateLimit-Reset" 标头显示您的速率限制重置之前的秒数。这告诉您何时您的请求计数将重新开始。例如,如果它显示 3,600,则意味着还有 3,600 秒直到限制重置。
是的,您可以随时通过访问您的账户并在账单页面上选择取消选项来取消您的计划。请注意,升级、降级和取消会立即生效。此外,取消后,您将不再有权访问该服务,即使您的配额中还有剩余调用。
为了让您有机会在没有任何承诺的情况下体验我们的 API,我们提供 7 天免费试用,允许您免费进行最多 50 次 API 调用。此试用只能使用一次,因此我们建议将其应用于您最感兴趣的 API。虽然我们的大多数 API 都提供免费试用,但有些可能不提供。试用在 7 天后或您进行了 50 次请求后结束,以先发生者为准。如果您在试用期间达到 50 次请求限制,您需要"开始您的付费计划"以继续发出请求。您可以在个人资料中的订阅 -> 选择您订阅的 API -> 定价标签下找到"开始您的付费计划"按钮。或者,如果您在第 7 天之前不取消订阅,您的免费试用将结束,您的计划将自动计费,授予您访问计划中指定的所有 API 调用的权限。请记住这一点以避免不必要的费用。
7 天后,您将被收取试用期间订阅的计划的全额费用。因此,在试用期结束前取消很重要。因忘记及时取消而提出的退款请求不被接受。
当您订阅 API 免费试用时,您可以进行最多 50 次 API 调用。如果您希望超出此限制进行额外的 API 调用,API 将提示您执行"开始您的付费计划"。您可以在个人资料中的订阅 -> 选择您订阅的 API -> 定价标签下找到"开始您的付费计划"按钮。
付款订单在每月 20 日至 30 日之间处理。如果您在 20 日之前提交请求,您的付款将在此时间范围内处理。
您可以通过我们的聊天渠道联系我们以获得即时帮助。我们始终在线,时间为上午 8 点至下午 5 点(EST)。如果您在该时间之后联系我们,我们将尽快回复您。此外,您可以通过 [email protected]

相关 API